ERW CommandPIA

THE INTELLIGENT PIA LEADERSHIP PROGRAMME

The Petroleum Industry Act belongs in the operating model.

← Programme home
15-Session Programme · 25 Minutes Per Day · Free · For leaders in Nigeria’s petroleum industry
WEEK 3 OF 3 · TRUST, CAPITAL AND THE NINETY DAYS · SESSIONS 11–15 · WORK AT YOUR OWN PACE
This week’s assessments: Pop Quiz 3 — Governance and Assurance after Session 12 · Practice Exam 3 — Full Syllabus after Session 14 · Final Exam in Session 15
By Session 15: you hold a signed 90-Day PIA Game Plan for your own company · Every assignment marked against a published rubric · Pass mark 70
Trust and Control · Chapter 12SESSION 11
AI Governance for PIA Decisions
Session 11 of 15 · 25-Minute Module

Why This Matters

Week 3 begins with trust, because every tool you have specified so far will be used for something it was never approved to do. Nobody plans that. A tool approved for document support is convenient, so people start using it to interpret a licence or prepare a submission, and nobody records the change. This session gives you the governance record that stops an application becoming a moving operating assumption: approved purpose, owners, data boundary, authority, and who may accept a change. It also covers the two things governance most often forgets — whether human review is real, and whether personal data has a lawful basis.

25-Minute Module
5:00 – 11:00
The governance record
  • For each application, keep one record that can be used, not filed.
  • FieldWhat it records
    Intended useThe approved purpose, and the authorities it is expressly excluded from
    OwnersProcess owner, model owner, data owner and accountable executive, each named
    Evaluation evidenceWhat was tested, the results and the limits accepted
    Monitoring and rollbackHow performance is watched and how the use is reversed
    Change triggersA new source, a new model or a new connection, each reassessed against consequence
  • The change triggers matter most. A new source introduces a new population of permissions. A new model may alter interpretation. A new connection may permit transactions. Each is a different application wearing the old name.
  • NIST’s AI Risk Management Framework offers a voluntary structure around Govern, Map, Measure and Manage. It can inform your design. It is not Nigerian petroleum law and it is not evidence of regulatory approval.
  • Governance should be proportionate. A read-only search service and a transaction agent both need ownership, evaluation and a boundary; the level of consequence determines the additional controls.
If the record cannot tell you who may accept a change, it is a description, not a control.
16:00 – 21:00
A fictional drift, and the first governance pilot
  • An assistant is approved to retrieve training records. A supervisor starts using it to rank employees for a safety-critical assignment. The original evaluation never tested ranking accuracy, fairness or competence for that decision.
  • Stop the unapproved use; let retrieval continue within its accepted boundary; investigate whether rankings influenced assignments and correct them through proper authority. It is a governance failure even if one ranking happens to be right.
  • UPSTREAM · THE WORKED CASE
    • Upstream. Illustrative: at a fictional operator’s flow station, the training-records assistant ranks technicians for a safety-critical task, and the ranking enters the crew plan unreviewed. The fix is the record, not a better ranking.
    ACROSS THE CHAIN · THE PARALLEL
    • Midstream and downstream. Illustrative: at a fictional depot, an assistant approved to retrieve documents is drafting readings of permission conditions. Retrieval continues; interpretation returns to the authorised specialist.
  • The first governance pilot takes an existing application and maps actual use against approved use. Observe how outputs enter official records, ask reviewers whether evidence arrives in time, and test access restrictions and change approval.
  • Define escalation for material errors, privacy events and unauthorised actions, and name who can suspend the service and how work continues manually. For the board: approved uses, material corrections, overdue reviews, failed access tests and incidents.
Governance is working when it changes operating behaviour and makes responsibility visible. A thicker policy file proves neither.
Key Terms

Excluded authority

A decision or action the application is expressly not approved to take or influence, such as interpreting a licence or ranking staff.

Lawful basis

Under the Nigeria Data Protection Act 2023, the legal ground for processing personal data. Consent is one basis, not the only one.

Self-Check — Before You Submit
1. A depot manager discovers that an assistant approved only for document retrieval has been used for three months to rank drivers for hazardous loads. One ranking was later checked and found sound. What is the right response?
  • A. Approve the ranking use retrospectively
  • B. Stop the ranking use, let retrieval continue within its boundary, and investigate and correct affected assignments through authority
  • C. Suspend the whole assistant permanently
  • D. Add a disclaimer to ranking outputs and continue
B. Stop the ranking use, let retrieval continue within its boundary, and investigate and correct affected assignments through authority — The ranking use was never evaluated, so it is a governance failure even if one result was right; retrieval was approved and can continue. Retrospective approval rewards drift, and a total suspension discards a use that was properly accepted.
2. Which statement about the NIST AI Risk Management Framework is accurate?
  • A. It is part of the Nigerian petroleum regulatory framework
  • B. Following it demonstrates regulatory approval of an AI tool
  • C. It replaces the need for a company governance record
  • D. It is voluntary guidance around Govern, Map, Measure and Manage that can inform governance
D. It is voluntary guidance around Govern, Map, Measure and Manage that can inform governance — The book is explicit: NIST’s framework is voluntary and can inform design, but it is neither Nigerian petroleum law nor evidence of approval. The tempting error is treating alignment with a respected framework as a regulator’s acceptance.
3. A tax manager receives an AI-prepared fiscal schedule forty minutes before submission and signs it. What has the company actually demonstrated?
  • A. Very little: review needs competence, time and access to evidence, and forty minutes may leave no practical chance to challenge it
  • B. Full human review, because a qualified person signed
  • C. That the AI tool is accurate enough for unsupervised use
  • D. Compliance with the Nigeria Data Protection Act 2023
A. Very little: review needs competence, time and access to evidence, and forty minutes may leave no practical chance to challenge it — A signature proves someone signed, not that the period, rule, inputs and treatment were examined. The trap is equating a qualified signatory with meaningful review when the process left no time to challenge the output.

Today’s Assignment

Write the governance record for one AI tool in use, or proposed, in your company, including how its actual use differs from its approved use.
  • Name the tool, its approved purpose and the authorities it is excluded from.
  • Name the process owner, model owner, data owner and accountable executive by role. Where one is missing, say so.
  • Describe actual use at the point of work — ask the people using it — and set it beside approved use. Name each drift and what you will do about it.
  • Define the review for its most consequential output: what the reviewer needs, how long they get, and how a material correction is recorded.
  • State the personal-data position: whether personal information is processed, the lawful basis, and what you would minimise.
  • Name who can suspend the tool and how work continues manually. If your company has no AI tool in use, govern the one most likely to be proposed for your Session 1 obligation.
YOUR GAME PLAN

Section 11 — The governance record and authority boundary.

How this is marked — the rubric
Approved purpose and excluded authorities stated precisely, with the four owners named by role and gaps admitted30
Actual use observed and compared with approved use, with at least one honest drift named and a response stated30
Review defined for the most consequential output, including time and evidence, and a correction record20
Personal-data treatment, suspension authority and manual continuation each stated20
Total · pass mark 70100
Submitting session 11
Write your answer in Word or Google Docs. The first line must read Session: 11, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
AI governance recordsDrift detectionMeaningful human reviewData protection by designSuspension authority
Tick it once you have submitted.Next: Session 12 →
Trust and Control · Chapters 13 and 14SESSION 12
Audit Readiness and Controlled Autonomy
Session 12 of 15 · 25-Minute Module

Why This Matters

Months after a return is filed, someone asks why a figure changed and who approved the adjustment. If the honest answer is a person’s memory, the company is not audit-ready, however good the final document looks. This session joins two disciplines that belong together: building a submission so it can be reconstructed by a stranger, and giving an AI agent enough authority to help without enough to act on a misunderstanding. Both come down to the same question — can you prove what actually happened, step by step? By the end you will specify your recurring return and draw the boundary any agent near it must respect.

25-Minute Module
4:00 – 10:00
The submission package and the assurance chain
  • Give each recurring submission an identifier and an approved specification: regulator, entity, asset coverage, period, due basis, template, evidence, reviewer and signatory, linked to its parent obligations.
  • Build evidence backwards from the final statement. A measured quantity needs its approved source and reconciliation; a completed action needs acceptance evidence; an estimate needs its method and authorisation.
  • Freeze submitted packs as controlled records. A correction produces a new version with a reason and an approved resubmission route. Editing the stored final file disconnects your records from what the recipient received.
  • EventWhat it showsWhat it does not yet show
    Transmission initiatedSending beganThat sending finished
    Transmission completedSending finishedThat the recipient has it
    Receipt acknowledgedThe recipient has itThat it was accepted
    Acceptance confirmedThe recipient accepted itNothing further on that submission
  • Distinguish no evidence found from action not performed: one may be a filing weakness, the other an execution weakness, and the owner investigates before anyone concludes. A neatly populated form using the wrong period is still wrong.
  • The assurance chain: the process owner performs the work; a separate reviewer checks material assertions; independent assurance samples completed packs — clean ones as well as flagged ones — and reconstructs them without relying on the preparer. Readiness must survive the preparer leaving.
If only the application chooses what assurance examines, nobody is testing what the application missed.
15:00 – 20:00
Untrusted instructions and reliable transactions
  • A retrieved document may contain text telling the agent to ignore rules, send information elsewhere or use another account. Treat it as material to analyse, not authority. The boundary belongs in tool and permission design — restricted destinations, file locations and transaction types — not only in prompts.
  • UPSTREAM · THE WORKED CASE
    • Upstream. Illustrative: a fictional operator’s renewal agent finds an attachment instructing it to send the complete pack externally. It ignores the instruction as an action request, preserves the letter as evidence and stays in staging. Where inspection acceptance cannot be found, it raises an exception rather than substituting a related report.
    ACROSS THE CHAIN · THE PARALLEL
    • Midstream and downstream. Illustrative: a fictional terminal’s agent gets no response after submitting a return. It does not resubmit. Receipt is investigated first, transaction identifiers and receipt evidence are stored, and a model’s sentence saying “submitted successfully” is not treated as proof of delivery.
  • Every task operation needs an identifier, and after a failed response you check whether the transaction succeeded before retrying. One communications error can otherwise create several tasks or duplicate submissions.
  • Provide and practise manual recovery before the first incident: an authorised operator suspends the agent, reaches the sources and continues the work.
  • Pilot with representative documents and dummy destinations; test missing attachments, conflicting dates, wrong entity, duplicate task, denied access, hostile instructions and interruption. Examine the logs beside the final narrative, then run shadow use before any consequential execution.
A correct final answer can conceal an unauthorised intermediate action. Read the log, not just the output.
Key Terms

Frozen pack

A submitted pack held as a controlled record. Corrections create a new version with a reason, never an edit to the stored final file.

Service identity

A separate account under which an agent acts, so its actions are traceable and revocable, and its permissions reflect its job rather than its sponsor’s authority.

Self-Check — Before You Submit
1. Your agent submitted a monthly return to the regulator’s portal and the connection timed out before any response. The deadline is today. What happens next?
  • A. Resubmit immediately so the deadline is not missed
  • B. Accept the agent’s log line saying the submission succeeded
  • C. Investigate whether receipt occurred before any resubmission, using stored transaction identifiers and receipt evidence
  • D. Edit the frozen pack and send a corrected version to be safe
C. Investigate whether receipt occurred before any resubmission, using stored transaction identifiers and receipt evidence — An uncertain response requires investigation of receipt before another submission, otherwise you risk duplicate or contradictory records. Resubmitting feels prudent under deadline pressure, and a model’s success sentence is not proof of delivery.
2. Which sequence correctly orders the receipt events for a submission?
  • A. Transmission initiated, transmission completed, receipt acknowledged, acceptance confirmed
  • B. Receipt acknowledged, transmission completed, acceptance confirmed, transmission initiated
  • C. Transmission completed, acceptance confirmed, receipt acknowledged, transmission initiated
  • D. Acceptance confirmed, receipt acknowledged, transmission initiated, transmission completed
A. Transmission initiated, transmission completed, receipt acknowledged, acceptance confirmed — Each later event proves something the earlier one does not; treating acknowledgement as acceptance is the common error. The distinction matters whenever a deadline or a payment depends on the outcome.
3. A sponsor proposes running a renewal agent under the regulatory manager’s own login “so it can reach everything it needs”. What is the best response?
  • A. Agree, because the manager is accountable anyway
  • B. Agree, provided the prompt forbids external sending
  • C. Agree for the pilot only and revisit at scale
  • D. Refuse: give the agent its own service identity with an allowlist matched to its job
D. Refuse: give the agent its own service identity with an allowlist matched to its job — A manager’s credentials make tracing and revocation harder and grant the sponsor’s broad authority to a bounded job. A prompt instruction alone is not a boundary; restrictions belong in tool and permission design.

Today’s Assignment

Specify the submission package for your company’s most important recurring return and, if an agent were introduced, its exact permitted actions, approval point and recovery route.
  • Write the package specification: identifier, regulator, entity, asset coverage, period, due basis, template, evidence, reviewer and signatory, and the parent obligation.
  • Trace the last submission’s largest figure backwards to its source. Say honestly where the chain breaks and whether the problem is filing or execution.
  • State how your business freezes submitted packs and records the four receipt events today. If it does not, say so.
  • Describe the assurance chain: who performs, who reviews, and who independently samples — including clean cases.
  • For an agent near this return: list its allowlist, the exact version-and-scope approval point, its service identity, and the manual recovery route. If your company is not a filer, use the report or certificate your work supplies to a licence holder.
YOUR GAME PLAN

Section 12 — The submission package and the agent boundary.

How this is marked — the rubric
Complete package specification naming the regulator, period, due basis, reviewer and signatory by role25
One figure traced backwards to source with an honest break point identified as filing or execution weakness25
Freezing, versioning and the four receipt events addressed, with the assurance chain including independent sampling of clean cases20
Agent boundary specified as an allowlist, a separate service identity, a version-specific approval point and a practised recovery route30
Total · pass mark 70100
Submitting session 12
Write your answer in Word or Google Docs. The first line must read Session: 12, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Pop Quiz 3 — Governance and Assurance opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

5 questions · 10 minutes · covers Sessions 11–12 · pass mark 70
Sit Pop Quiz 3 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Audit-ready submissionsEvidence built backwardsAssurance samplingBounded agentsTransaction reliabilityHostile-input defence
Tick it once you have submitted.Next: Session 13 →
Capital and Capability · Chapters 15 and 16SESSION 13
Fiscal Intelligence, Retirement and Nigerian Capability
Session 13 of 15 · 25-Minute Module

Why This Matters

Sooner or later your PIA work meets capital: an acquisition, an extension, a retirement liability, a budget request for the evidence programme itself. That is where weak distinctions become expensive. A sensitivity gets mistaken for a statutory computation, a provision for cash in a fund, a contractor’s promise for your own capability. This session teaches the fiscal and retirement distinctions, walks two worked numbers from the book, and asks you to write the honest capital case for your own initiative — including the uncomfortable result when the arithmetic does not pay. Then it asks which capability your company must own rather than rent.

25-Minute Module
5:00 – 11:00
Retirement: liability, schedule and cash are different things
  • The Nigerian Upstream Petroleum Decommissioning and Abandonment Regulations 2026 address plans, updates, asset records, funds and reporting. Regulation 25 revokes the 2023 regulations with savings, so an upstream process relying only on the former instrument needs review.
  • Link physical inventory, engineering scope, estimate, approved plan, contribution and fund evidence. Financial recognition, an approved funding schedule and cash held are related but distinct.
  • Illustrative funding sensitivityFigure
    Assumed retirement estimate today$20 million
    Horizon and assumed cost escalation10 years at 4% a year
    Projected nominal cost ($20m × 1.0410)≈ $29.605 million
    Spread evenly over ten years≈ $2.960 million a year
    Assumed fund balance$8 million
    Gap, before contributions, investments, exchange and scope changes≈ $21.605 million
  • This is arithmetic illustrating escalation and timing. It is not a statutory contribution formula or a substitute for the approved funding basis. Test shorter life and higher cost: if retirement comes in six years, a ten-year assumption is potentially misleading.
  • In diligence, a clean data room is not proof of a clean asset.
Ask for three numbers on one page: the recognised liability, the required contribution and the cash held. If you receive one, ask again.
16:00 – 21:00
Capability you own, not rent
  • Contractual flow-down can require suppliers to perform controls or supply records. It does not transfer the licence holder’s statutory accountability.
  • The Nigerian Oil and Gas Industry Content Development Act 2010 is a separate statutory basis. Link its obligations into your programme without calling them PIA provisions.
  • Make local capability measurable: who maintains sources, explains limitations, manages permissions, investigates incidents and continues work during an outage? A training promise is incomplete until people can do those jobs. Train by role; assess through tasks, not attendance.
  • UPSTREAM · THE WORKED CASE
    • Upstream. Illustrative: a fictional operator’s integrity contract flows record-keeping down to the contractor. When a record is missing, the operator still answers for the obligation. Flow-down moved the work, not the accountability.
    ACROSS THE CHAIN · THE PARALLEL
    • Service company. Illustrative: a fictional contractor bids for integrity work and its assistant drafts a persuasive response from earlier jobs. The reviewer checks that team and equipment actually match the scope. If mobilisation depends on buying equipment, cost and timing go into the bid decision — the assistant must not erase dependencies by writing in the future tense.
  • A missing attachment and a missing capability call for different responses. In procurement, require exportable records and a handover your own staff demonstrate.
Have your own staff recover from a simulated outage with the vendor out of the room. That is your capability.
Key Terms

Funding sensitivity

Illustrative arithmetic showing how escalation, timing and fund balance affect a retirement estimate. Not a statutory contribution formula.

Net present value (NPV)

The present value of future net benefits at a stated discount rate, minus the initial cost. Negative NPV means the case is not financially attractive on those inputs alone.

Self-Check — Before You Submit
1. Using the book’s illustrative inputs — ₦30m to establish, ₦12m a year to operate, ₦24m a year demonstrated improvement, 15% over three years — what is the honest conclusion?
  • A. NPV is roughly −₦2.601m, so it is not financially attractive on that basis alone; any other justified reason must be stated
  • B. Payback of 2.5 years makes it attractive, so NPV can be ignored
  • C. Add an estimate of avoided regulatory fines until NPV is positive
  • D. NPV is roughly +₦42m because ₦24m a year over three years exceeds ₦30m
A. NPV is roughly −₦2.601m, so it is not financially attractive on that basis alone; any other justified reason must be stated — Net benefit is ₦12m a year, worth about ₦27.399m in present value, against ₦30m to establish. Adding invented avoided fines is the tempting repair; the book says state real reasons such as control repair instead.
2. A fictional upstream operator’s board paper shows a $20m retirement estimate escalated at 4% for ten years and a fund of $8m. A director asks whether the ≈$2.960m a year is the statutory contribution. What do you say?
  • A. Yes, because it is calculated under the 2026 regulations
  • B. Yes, but only for the first ten years
  • C. No: it illustrates escalation and timing, and the approved funding basis governs; we should also test a shorter life
  • D. No, because the 2023 regulations still apply in full
C. No: it illustrates escalation and timing, and the approved funding basis governs; we should also test a shorter life — The book states the arithmetic is not a statutory contribution formula. The trap in the last option is the instrument: regulation 25 of the 2026 regulations revokes the 2023 regulations with savings, so relying only on 2023 needs review.
3. Your operator’s contract requires a contractor to keep inspection records. One is missing at audit. Where does statutory accountability sit?
  • A. With the contractor, because the contract flowed the obligation down
  • B. With the licence holder, because flow-down does not automatically transfer statutory accountability
  • C. With the regulator, because it approved the contractor
  • D. Nowhere, until the contract is renegotiated
B. With the licence holder, because flow-down does not automatically transfer statutory accountability — Flow-down can require suppliers to perform controls or provide records, but the licence holder remains answerable. Believing the contract moved the accountability is exactly the mistake that leaves an obligation unowned.

Today’s Assignment

Write the honest capital case for your company’s PIA initiative and name the capability your business must own rather than rent.
  • State the initiative and the obligation it serves, carried from your earlier sections.
  • Give establishment cost, annual operating cost and the benefit you can actually demonstrate, each with its source. Label every assumption as illustrative or approved.
  • Calculate net annual benefit and simple payback; add NPV on a stated discount rate and period if finance can support one. Show the arithmetic.
  • If the case is weak or negative, say so plainly, then state any non-financial justification such as control repair. Do not invent avoided fines.
  • If a fiscal or retirement figure is involved, separate sensitivity from statutory computation and name the current instrument a specialist must confirm.
  • Name the one capability your company must own, the role that will hold it, and how you will test it through a task rather than attendance.
YOUR GAME PLAN

Section 13 — The honest capital case and the capability we will own.

How this is marked — the rubric
Costs and demonstrated benefit stated with sources, every assumption labelled, and arithmetic shown30
The financial conclusion stated honestly, with any non-financial justification named and no invented avoided fines30
Sensitivity kept distinct from statutory computation, with the current instrument identified where relevant15
One owned capability named with a role and a task-based test, distinct from contractual flow-down25
Total · pass mark 70100
Submitting session 13
Write your answer in Word or Google Docs. The first line must read Session: 13, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Fiscal rule disciplineRetirement funding literacyHonest investment casesNPV and paybackOwned capabilitySupplier accountability
Tick it once you have submitted.Next: Session 14 →
The Board · Appendix BSESSION 14
The Board Scorecard and the Investment Paper
Session 14 of 15 · 25-Minute Module

Why This Matters

Your board probably receives a great deal about compliance and very little it can decide on. Counts of documents, prompts and licences show activity; they do not show that obligations are executed. This session gives you a scorecard of thirteen measures, each with a denominator, evidence and owner; the status words that stop one colour hiding several different problems; a way to run the monthly executive meeting so it resolves rather than reads; and the one-page investment recommendation that asks for an exact decision. You leave with the five to seven measures you will report and the decision you will request.

25-Minute Module
4:00 – 11:00
The obligation execution scorecard
  • Appendix B of the book sets out thirteen measures. The first seven test execution.
  • MeasureWhat it reveals
    Applicability approvedUnfinished legal mapping: priority obligations without current source and signed applicability
    Ownership assignedResponsibility gaps
    Evidence completeReadiness against approved criteria, not file volume
    On-time accepted completionOutcomes with required acceptance; submission kept distinct from external approval
    Open high-consequence exceptionsDecisions requiring attention, under your approved consequence method
    Decision ageTime since a material exception was ready for a named authority to decide
    Resource decisions outstandingCorrective work awaiting funds, staff or inspection
  • The other six test whether the system can be trusted and whether value is real.
  • MeasureWhat it tests
    Assurance reconstructionWhether sampled completed cases can be independently rebuilt from evidence
    Wrong-source incidentsCorpus control: decisions using obsolete, unauthenticated or out-of-scope sources
    Reviewer correction effortThe hidden cost: specialist time correcting output for comparable work
    Permission control failuresThe boundary: failed access tests or actions beyond authority
    Recovery demonstratedResilience: manual continuation or rollback actually exercised
    Benefit verifiedOutcomes with approved attribution and financial treatment, kept apart from projection
  • The book sets no universal green percentage or exception-age limit. Thresholds follow consequence: a low-volume critical obligation may need immediate escalation while a routine evidence correction follows an agreed queue.
Decision age is the measure executives least like and most need. It is the one that measures us.
16:00 – 21:00
The one-page investment recommendation
  • Twelve sections, one page, evidence and financial model attached: decision requested, operating problem, obligation connection, alternatives, evaluation, live evidence, economics, authority, dependencies, sustainability, recommendation and conditions.
  • Write the decision before the solution narrative. “Approve a defined evaluation budget for a read-only completeness assistant at one facility, subject to source authentication and access testing” is reviewable. “Approve AI transformation across the group” cannot establish scope or acceptance.
  • In the decision rights matrix, advisory contribution stays distinct from authority. The model’s confidence does not enlarge anyone’s delegation.
  • UPSTREAM · THE WORKED CASE
    • Upstream. Illustrative: a fictional operator’s retrieval pilot shows faster source search, material condition omissions still present and reviewer hours unchanged. The right decision is narrower retrieval use with specialist review — not expansion into automated completeness approval.
    ACROSS THE CHAIN · THE PARALLEL
    • Midstream and downstream. Illustrative: a fictional refinery asks the board to fund a completeness checker for product release evidence. The decision requested names one site, a budget and a read-only boundary; product release stays with the authorised quality role, and the conditions say what evidence must exist before authority advances.
If you cannot write the decision requested in one sentence, you are not ready to ask for it.
Key Terms

Decision age

Time since a material exception became ready for a named authority to decide. It reveals authority or capacity bottlenecks.

Decision requested

The first line of the one-page investment recommendation: exact amount, scope, authority and timing, written before any solution narrative.

Self-Check — Before You Submit
1. A pilot report says “80% evidence complete”. What should a director ask first?
  • A. Whether 80% is above the industry green threshold
  • B. Which AI model produced the figure
  • C. Whether the figure can be rounded up for the annual report
  • D. What the denominator is — for example, four of five selected obligations — and how they were selected
D. What the denominator is — for example, four of five selected obligations — and how they were selected — Counts belong beside percentages, and four of five is not eighty of one hundred. The tempting option assumes a universal green threshold, which the book expressly declines to set.
2. An item on the register has been marked overdue for six weeks. What does that status alone tell the committee?
  • A. Only that a time condition has passed; whether it is preparing, blocked or awaiting an external response must be stated
  • B. That the obligation has failed
  • C. That the owner has not done the work
  • D. That the regulator has rejected the application
A. Only that a time condition has passed; whether it is preparing, blocked or awaiting an external response must be stated — Overdue is a time condition, not an outcome. Treating it as failure or blame skips the real question, because a blocked item and one awaiting external response need entirely different decisions.
3. A fictional distributor’s pilot gave faster retrieval, but reviewers still correct material omissions and their hours have not fallen. The vendor proposes group-wide automated completeness approval. What should the board decide?
  • A. Approve expansion, because retrieval is demonstrably faster
  • B. Narrow to retrieval with specialist review, address the omissions, and set a fresh evaluation gate
  • C. Stop and discard the pilot entirely
  • D. Approve expansion if the model reports high confidence
B. Narrow to retrieval with specialist review, address the omissions, and set a fresh evaluation gate — The book’s illustrative review keeps the demonstrated capability while addressing the weakness. Expansion ignores unchanged reviewer hours, stopping wastes useful work, and model confidence never enlarges a delegation.

Today’s Assignment

Choose five to seven scorecard measures for your company’s PIA programme and draft the decision requested and conditions lines of your one-page investment recommendation.
  • Select five to seven of the thirteen measures. For each, give the denominator, the evidence source, the owner by role, and why your board needs it.
  • Include at least one measure that will make your business look worse before it looks better, and say which.
  • Name one measure your board receives today that shows activity rather than execution, and what replaces it.
  • Write the “decision requested” line: exact amount, scope, authority and timing, in one or two sentences.
  • Write the “conditions” line: the evidence required before expenditure or authority advances.
YOUR GAME PLAN

Section 14 — The board scorecard and the decision we will ask for.

How this is marked — the rubric
Five to seven measures drawn from the scorecard, each with a stated denominator, evidence source and owner by role35
An honest uncomfortable measure included and one current activity measure identified for replacement20
Decision requested states exact amount, scope, authority and timing, written before any solution narrative25
Conditions name the specific evidence required before expenditure or authority advances20
Total · pass mark 70100
Submitting session 14
Write your answer in Word or Google Docs. The first line must read Session: 14, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Practice Exam 3 — Full Syllabus opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

15 questions · 25 minutes · covers Sessions 1–14 · pass mark 70
Sit Practice Exam 3 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Board scorecard designMeasures with denominatorsStatus disciplineExecutive meeting designInvestment recommendation
Tick it once you have submitted.Next: Session 15 →
The Leadership Mandate · Chapter 17 · CapstoneSESSION 15
The Ninety-Day PIA Game Plan
Session 15 of 15 · 25-Minute Module

Why This Matters

Fourteen sessions ago I asked you to choose the one obligation that matters most to your business and answer four plain questions about it. Today you turn everything you have written since into a plan someone can sign and hold you to. This session has three parts: how to choose the first ninety days so they prove something; the twelve leadership commitments that turn aspiration into evidence; and the capstone, your signed 90-Day PIA Game Plan. I have tried to be direct with you throughout rather than encouraging. I will keep that up for one more session, because the plan is only as good as the honesty in it.

25-Minute Module
4:00 – 10:00
The ninety days, and the gates
  • WindowThe workThe gate
    Days 1–30Sponsor and owner appointed. Entity, asset, sources and interpretation mapped. Decision, evidence chain and manual process defined. Baseline recorded: time, rework, unresolved exceptions, specialist effort. Reference cases include known failures.Map, evidence index, workflow, baseline and signed charter — or fix the foundation first.
    Days 31–60The smallest useful application — retrieval, comparison or completeness checking — on realistic sources. Test wrong versions, missing conditions, conflicting dates, wrong assets, denied access. Practise manual continuation.A readiness decision on evidence. A demonstration is not the gate.
    Days 61–90Live work inside the accepted boundary. Record output, review, correction and outcome; measure total effort; review exceptions weekly.Scale, narrow, repair or stop — each with a reason and evidence.
  • Bring finance in during the first thirty days. A benefit estimated after a successful demonstration is less dependable than a baseline agreed beforehand.
  • Do not weaken criteria because the team wants success.
  • THE DOCTRINE

    At day ninety, decide to scale, narrow, repair or stop. Each can be sensible. Continuing an unsuccessful application because money has been spent is not disciplined implementation.

Write the day-ninety criteria into the charter now, while nobody yet has a stake in the answer.
15:00 – 20:00
What you have built
  • Your game plan already exists in fourteen pieces.
  • SectionsWhat they establish
    1–2The obligation, the four questions, the trace and its first fix
    3–5Obligation record, decision rights, evidence index and data gaps
    6The AI role: layers, rules versus model, and the approval boundary
    7–10Permissions, quantities, stakeholder or environmental evidence, the critical handoff
    11–12Governance record, submission package, agent boundary
    13–14Capital case, owned capability, scorecard and the decision you will ask for
  • A plan that has learned nothing in three weeks would worry me more than one with visible corrections.
Read the assembled plan as your most sceptical board member, and fix whatever would not survive the one question that matters: how do you know.
Key Terms

Readiness gate

The day-sixty decision, made on evidence from realistic tests, whether the application is ready for shadow use, limited advice or further repair. A demonstration does not pass it.

Leadership commitments

Twelve recommended disciplines, from approved applicability to sustained ownership, each converted into a deliverable and an owner. Not additional legal duties.

Self-Check — Before You Submit
1. On day fifty-five, a vendor gives an impressive live demonstration to the executive committee. The sponsor suggests treating it as the day-sixty readiness decision. What do you advise?
  • A. Accept it, because the committee has seen the tool work
  • B. Accept it, provided the vendor signs a performance warranty
  • C. Decline: readiness is decided on evidence from realistic tests, including the failure cases
  • D. Skip the gate and move straight to the day-ninety decision
C. Decline: readiness is decided on evidence from realistic tests, including the failure cases — A demonstration is not the readiness gate; the book requires a decision based on evidence from realistic testing. A warranty is a commercial remedy, not proof the application handles the failure cases.
2. At day ninety, the pilot has cost ₦18 million, reviewers still correct material errors, and the team argues that stopping would waste the investment. Which outcomes may the committee properly choose?
  • A. Only scale, because stopping would waste the investment
  • B. Scale, narrow, repair or stop, decided on evidence; sunk cost is not a reason to continue
  • C. Only stop, because errors remain
  • D. Defer the decision until the money has been recovered
B. Scale, narrow, repair or stop, decided on evidence; sunk cost is not a reason to continue — Each of the four outcomes can be sensible, and narrowing or repairing may preserve real value. Continuing because money has been spent is exactly what the book calls undisciplined implementation.
3. Which of these is a properly formed leadership commitment for your game plan?
  • A. “Tested recovery” — owner: plant manager; deliverable: a completed manual-continuation exercise by day sixty
  • B. “We are committed to world-class compliance”
  • C. “Tested recovery” — a new legal duty under the PIA
  • D. “Measured outcomes” — to be defined after the pilot succeeds
A. “Tested recovery” — owner: plant manager; deliverable: a completed manual-continuation exercise by day sixty — Each commitment needs a deliverable and an owner, and recovery needs a completed exercise. The commitments are disciplines rather than legal duties, and outcomes defined after success are retrospective claims.

Today’s Assignment

Assemble Sections 1–14 into one signed 90-Day PIA Game Plan for your company, with a one-page executive summary — this capstone will run well beyond the usual 900 words, and that is expected.
  • Assemble all fourteen sections in order and make them consistent; where a later session changed your mind, correct the earlier section and note it.
  • Name the first pilot as a business problem, without naming a product, and justify it on consequence, evidence readiness and owner commitment. State its acceptance decision as an operating right.
  • State the baseline — time, rework, unresolved exceptions and specialist effort — with its source and period. If it has not been measured, make it a days 1–30 deliverable with an owner and a date.
  • Name the sponsor and the process owner by role and name, and give the start date as an actual date.
  • Set the day-30, day-60 and day-90 gates with the evidence each requires, and write the scale, narrow, repair or stop criteria now.
  • List the twelve commitments, each with a concrete deliverable and an owner, and name the one your business is least likely to keep.
  • Write the one-page executive summary — decision requested, obligation, pilot, baseline, sponsor, owner, start date, gates — then sign and date the plan.
YOUR GAME PLAN

Section 15 — The assembled, signed 90-Day PIA Game Plan with its executive summary.

How this is marked — the rubric
All fourteen sections present, in order and internally consistent, with no placeholders and corrections acknowledged20
A named first pilot stated as a business problem, justified on consequence, evidence readiness and owner commitment20
A real baseline with source and period, or a chartered baseline task with owner and date, rather than a target or benchmark20
Sponsor and owner named by role and name, an actual start date, and day-30, day-60 and day-90 gates with evidence criteria set in advance20
All twelve commitments each carrying a deliverable and a named owner, and a signed one-page executive summary20
Total · pass mark 70100
Submitting session 15
Write your answer in Word or Google Docs. The first line must read Session: 15, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
FINAL EXAM

Your Final Exam is sat in this session. 15 questions, of which 3 are rebuilt from questions you got wrong on the practice papers. Sit it once your capstone is submitted.

15 questions · 30 minutes · covers Sessions 1–15 · pass mark 70
Sit the Final Exam →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Pilot selectionNinety-day gatingCommitments into evidenceDay-ninety decisionGame plan assemblyBoard-ready summary
Tick it once you have submitted.Sit the Final Exam →