ERW CommandBarrel

THE INTELLIGENT BARREL LEADERSHIP PROGRAMME

Connect the capability to the barrel.

← Programme home
30-Session Programme · 25 Minutes Per Day · Free · For leaders in Nigeria’s oil and gas sector
WEEK 6 OF 6 · THE LEADERSHIP MANDATE · SESSIONS 26–30 · WORK AT YOUR OWN PACE
This week’s assessments: Pop Quiz 6 — The Game Plan after Session 28 · Practice Exam 6 — Full Syllabus after Session 29 · Final Exam in Session 30
By Session 30: you hold a signed 90-Day AI Survival Game Plan for your own company · Every assignment marked against a published rubric · Pass mark 70
Part Six · The Leadership MandateSESSION 26
Building Capability That Stays
Session 26 of 30 · 25-Minute Module

Why This Matters

In Session 25 you mapped the capability each role in your company needs. A map is not yet a workforce. Today you turn it into something the board can fund and hold you to: a 90-day capability pilot and a scoreboard that measures capability built, models owned and dependency reduced, each against a baseline. The uncomfortable part comes first. Ask what your company paid outside parties last year for work its own people could have done, and which models it relies on that nobody inside can maintain. Chapter 16 is plain about where the risk lies: not in competitors buying newer tools, but in competitors owning the capability while you keep renting it.

25-Minute Module
5:00 – 11:00
The 90-day capability pilot
  • Do not try to upskill the whole company. Target one role group, asset team or capability gap where the pain is clear: field analytics for one asset's engineering team, say, or data engineering for the function that most often stalls AI work.
  • DaysPurposeWhat it produces
    1–30Discovery and baseline: identify the gap, quantify its cost, map the target roles, define ownershipA charter: scope, baseline, target capability levels, success metrics, stakeholders, governance and a link to a real operating decision
    31–60Build in context: role-based curriculum, hands-on training on the company's own data and tools, mentoring, applied projectsPeople demonstrably doing something they could not do before, on a real asset
    61–90Applied adoption: live work, reviewed in normal operating routinesA record of which capabilities changed real decisions and produced measurable value
  • Before any course, state the value case in dependency reduced and performance improved, validate it with finance, and design how the skill will be used: which decision, which routine, which mentor. End with a disciplined decision: continue, expand, adjust or stop.
  • THE DOCTRINE

    A pilot is successful only when it proves a repeatable pattern: that capability built in context changes decisions and creates value. Anything less is a course, not a transformation.

Choose the gap that already costs you money. A pilot aimed at goodwill will be judged on goodwill.
17:00 – 22:00
Scaling, rhythm and the scoreboard
  • Scale rests on three principles: standardisation of capability levels and assessment; modularity, reusable modules combined into role pathways; and ownership, an executive sponsor, role owner and performance outcome for every track. Then put capability into the rhythm: can the team validate today's alerts, which gap caused this week's avoidable vendor call, how is dependency trending this month?
  • THE DOCTRINE

    Executives should not measure capability by courses run, people trained or certificates issued. Those are activity metrics. The board should measure capability by the ownership and performance it produces.

  • IndicatorWhat it tells the board
    AI literacy completionShare of each role at its target literacy level
    Local model ownershipShare of models your own people build, maintain and govern
    Workflow adoptionWhether the tools are used in daily work
    Field reporting qualityQuality, completeness and timeliness of captured data
    Local vendor capabilityWhether Nigerian vendors can deliver AI-enabled services
    Training-to-performance conversionRate at which training becomes measurable improvement
    Reduced external dependencyTrend in vendor spend on work you could do yourself
    Digital career pathwaysWhether pathways exist and retain talent
  • Each needs a baseline. Low adoption despite high completion means the application loop, not the curriculum, needs attention. Add the book's final metric, learning velocity. The book's scoreboard figure is illustrative; your baselines must be your own.
If two of the eight have no baseline, say so. An honest blank is worth more than an invented figure.
Key Terms

Local model ownership

The share of the models the company depends on that its own people build, maintain and govern.

Learning velocity

How quickly lessons from applied projects, successful and failed, feed back into how people are developed.

Self-Check — Before You Submit
1. In a fictional EPC company, HR reports that nearly every engineer has completed an AI course and proposes rolling it out company-wide. Workflow adoption remains low. What do you do?
  • A. Approve the rollout, since completion is high
  • B. Fix the application loop first, deciding which decision each skill improves and in which routine, and scale only once adoption is proven
  • C. Replace the course with a more advanced one
  • D. Stop measuring adoption, since HR cannot control it
B. Fix the application loop first, deciding which decision each skill improves and in which routine, and scale only once adoption is proven — Low adoption despite high completion means the application loop needs attention, and scale rewards proven application. Approving the rollout scales unapplied training, which the book says multiplies cost.
2. According to Chapter 16, what makes human-in-the-loop genuinely safe?
  • A. A senior signature on every model output
  • B. A vendor warranty on the model
  • C. Keeping AI out of field decisions
  • D. A human capable of interpreting, verifying and governing the model
D. A human capable of interpreting, verifying and governing the model — The loop only functions if the human is capable; otherwise validation is a rubber stamp. A senior signature without that capability is exactly the rubber stamp the book warns about.
3. Which are the book's three principles for scaling a capability programme?
  • A. Standardisation, modularity and ownership
  • B. Literacy, application and ownership
  • C. Speed, scale and certification
  • D. Centralisation, outsourcing and audit
A. Standardisation, modularity and ownership — Chapter 16 names standardisation, modularity and ownership. Literacy, application and ownership are stages of the maturity curve, a different idea.

Today’s Assignment

Write Section 26 of your plan: your company's 90-day capability pilot and capability scoreboard, each measure with a baseline.
  • Name the capability gap that costs your company most and quantify it: vendor spend on work your people could do, decisions delayed, models nobody inside can maintain. Where you lack a figure, name who will find it by day 30.
  • Write the charter for one role group, asset team or gap: scope, baseline, target capability levels, success metrics, stakeholders, governance and the operating decision it improves.
  • Lay out days 1–30, 31–60 and 61–90 with the sponsor and role owner by role, and the routine and mentor for applying the skill.
  • Build the scoreboard: the eight indicators, each with today's baseline or an honest blank and an owner, plus learning velocity.
  • Say honestly where your company counts activity instead of capability, and close with your continue, expand, adjust or stop criteria. If your company has no AI in use yet, work from the vendor dependency or decision in front of you.
YOUR 90-DAY PLAN

Section 26 — Our capability pilot and scoreboard.

How this is marked — the rubric
Names the costliest capability gap and quantifies it, or names who will by day 3020
A charter with scope, baseline, target levels, success metrics, governance and one operating decision25
Three phases with sponsor and role owner by role and a designed application loop20
All eight indicators with baselines or honest blanks and owners, plus learning velocity25
An honest account of activity metrics, with stop-or-scale criteria10
Total · pass mark 70100
Submitting session 26
Write your answer in Word or Google Docs. The first line must read Session: 26, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Capability value mappingCapability pilot designHuman-in-the-loop competenceCapability scoreboardScaling without losing control
Tick it once you have submitted.Next: Session 27 →
Part Six · The Leadership MandateSESSION 27
The 12-Pillar AI Game Plan
Session 27 of 30 · 25-Minute Module

Why This Matters

The wrong question in this market is which AI tool to buy. The right one, Chapter 17 says, is what your company must become so that AI can actually improve performance. Today you meet the book's answer: twelve pillars, from executive AI fluency to ecosystem partnerships, around which every Nigerian oil and gas company should build its roadmap. They are not a menu. They are sequenced, with governance and data first and autonomy last, and the book calls skipping the sequence the most common and most expensive failure mode in this industry. You will score your company against all twelve, honestly, and choose the three that come first.

25-Minute Module
5:00 – 12:00
The foundations and the reliability core: pillars 1 to 6
  • The foundational pillars (fluency, data, visibility, governance) make the high-value pillars (optimisation, twins, surveillance, autonomy) possible and safe: the Sequencing Discipline applied to the whole company.
  • PillarWhat the book directsWhat good looks like
    1. Executive AI FluencyBoard-level AI literacy as the first project; strategy owned at the executive table, not by IT or a vendorA fluent CEO can ask for the model inventory, who owns this data and where a reported number came from, and get real answers
    2. AI-Ready Data FoundationA data contract per critical domain; build around the highest-value decisions, not an enterprise data lakeEvery critical domain has a contract in force
    3. Operational VisibilityOne operational picture; the daily review run on exceptionsYou know your decision latency, signal to validated action, without a month-end report
    4. Predictive Maintenance and Asset ReliabilityStart with pumps, compressors and critical rotating equipment; close the loop to procurementAlerts are failure-mode specific and reach a named owner
    5. Production OptimisationDecline-curve analytics on every well plus constraint management; deferment causes and underperforming wells firstA daily rhythm finds this week's binding constraint, then the next
    6. Digital Twins and Living Asset IntelligenceLean, fit-for-purpose twins; earn the descriptive stage firstThe twin stays synchronised and is tied to real decisions such as workover sequencing
  • The book names thirteen critical data domains, from asset and production to workforce and client or tender. On brownfield assets the first work is data archaeology. And the investment pays twice: the lineage that makes AI trustworthy is what NUPRC's move to measurement-based MRV reporting demands.
  • THE DOCTRINE

    An alert that reaches no named owner is operational noise, and an inventory of alerts nobody acts on is worse than no system at all.

Score pillar 1 first. If the executive table cannot pass the fluency test, every other score is optimistic.
18:00 – 22:00
Scoring honestly and choosing three
  • THE DOCTRINE

    The twelve pillars are not a menu; they are an interlocking system with a deliberate order. Governance and data first, autonomy last.

  • Score each pillar against what good looks like in the tables above: in place, partial or absent, with one line of evidence you could show a sceptical director tomorrow. For pillar 1 the book gives the test itself: the three questions a fluent CEO can ask.
  • Rank the three that come first using two filters. The Sequencing Discipline: a high-value pillar ranked above a missing foundation needs a written reason. The Operations-Excellence Lens: each of the three must connect to the one loss you named in Section 1.
  • If none of pillars 1 to 3 is among your three, check your scores again. Attempt the exciting pillars without the foundations, the book warns, and the programme will stall, leak money or create risk faster than value.
Score the company you run, not the one in the annual report.
Key Terms

Decision latency

The elapsed time from signal to validated action; the variable the book says everything else in operational visibility rides on.

Route-risk scoring

Ranking pipeline routes by exposure so scarce drones, patrols and rapid-response teams concentrate where risk is highest.

Self-Check — Before You Submit
1. A fictional upstream operator's board wants to start with an AI agent that adjusts production settings. Its production data has no owners or definitions. What do you recommend?
  • A. Proceed, because high-value pillars pay most
  • B. Build an enterprise data lake first
  • C. Start with fluency, data contracts and visibility for the decisions that matter, then sequence the rest
  • D. Buy the agent and fix data as problems appear
C. Start with fluency, data contracts and visibility for the decisions that matter, then sequence the rest — The book puts governance and data first and autonomy last, and calls skipping the sequence the most expensive failure. The enterprise data lake is what the book tells you to resist.
2. Which elements make up a data contract under pillar 2?
  • A. A named owner, standard definition, validation rule, quality threshold and reporting standard
  • B. A vendor, a licence fee, a service level and a renewal date
  • C. A dashboard, a data lake and a model
  • D. A regulator, a template and a deadline
A. A named owner, standard definition, validation rule, quality threshold and reporting standard — Those are the five elements of the book's data contract. A vendor agreement is commercial and says nothing about who owns the data or how quality is judged.
3. Staff at a fictional fabrication yard paste client drawings into public AI tools. What does pillar 10 direct?
  • A. Ban all AI use
  • B. Wait for an incident
  • C. Have staff sign a policy
  • D. Provide a governed AI environment, yes within controls, and classify the data
D. Provide a governed AI environment, yes within controls, and classify the data — A ban is tempting, but the book says it drives shadow usage into public tools, leaving the leakage risk in place and out of sight.

Today’s Assignment

Write Section 27 of your plan: your company scored honestly against the twelve pillars, and the three that come first.
  • Score all twelve pillars as in place, partial or absent against what good looks like in this session's tables, with one line of evidence each.
  • Name at least two pillars where your company has told itself a better story than the evidence supports.
  • Rank the three pillars that come first, showing how each connects to your Section 1 loss and where it sits in the sequence. Justify any high-value pillar ranked above a missing foundation.
  • For each of the three, name the owner by role and the first move from the book's direction.
  • Name one pillar you are deliberately deferring, and why. If your company has no AI in use yet, score it anyway: most pillars test operating discipline, not software.
YOUR 90-DAY PLAN

Section 27 — Our company scored on the twelve pillars, and the three that come first.

How this is marked — the rubric
All twelve pillars scored against the session's standard, with evidence for each30
At least two over-generous self-assessments corrected honestly20
Three pillars ranked with explicit links to the Section 1 loss and the sequence30
Owner by role and first move for each of the three, plus a reasoned deferral20
Total · pass mark 70100
Submitting session 27
Write your answer in Word or Google Docs. The first line must read Session: 27, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Operating-model readinessTwelve-pillar assessmentSequencing the roadmapData contractsShadow AI risk
Tick it once you have submitted.Next: Session 28 →
Part Six · The Leadership MandateSESSION 28
The Game Plan for Your Kind of Company
Session 28 of 30 · 25-Minute Module

Why This Matters

The twelve pillars apply to every company in the industry, but not in the same order. Chapter 17 sets out where each type of company should start: upstream operators, marginal field operators, EPC and construction companies, drilling and well services, marine and logistics, fabrication yards, and downstream, midstream and gas companies. Today you take the plan for your type, test it against the three pillars you ranked in Section 27, and choose the KPIs your board will track, each with a baseline. Then you hold up the book's eight-part leadership model and ask the harder question: which of those capabilities you are currently missing. Pop Quiz 6 opens at the end.

25-Minute Module
4:00 – 11:00
The plan by company type
  • The book's priorities and objective for each type:
  • Company typePriorities the book namesObjective
    Upstream operatorsProduction optimisation, predictive maintenance, digital twins, pipeline surveillance, emissions reporting, asset-integrity analytics, workover prioritisation, field-operations dashboards, contractor-performance analyticsProtect production, reduce deferment, improve reliability and increase asset visibility, turning the existing asset base into the source of the barrels the national targets require
    Marginal field operatorsLow-cost production analytics, maintenance prioritisation, cash-sensitive operating dashboards, workover decision support, lean digital-twin models, decline monitoring, contractor-cost analytics, compliance automationOperate with major-level intelligence without major-level overhead, using AI as a force multiplier on thin margins where candidate selection and deferment control decide survival
    EPC and constructionAI-assisted project controls, schedule-risk prediction, cost-variance detection, procurement-expediting intelligence, subcontractor scorecards, HSE-risk prediction, document-control automation, tender intelligenceDeliver faster with stronger cost control and fewer execution surprises, because the unforecast surprise is where margin disappears
    Drilling and well servicesRig-equipment reliability, crew-competency tracking, non-productive-time analysis, maintenance forecasting, spare-parts planning, HSE-observation analytics, well-intervention intelligence, client-reporting automationReduce non-productive time and improve service reliability, the two numbers that drive client retention and the company's own economics
    Marine, logistics and vessel operatorsVessel-maintenance prediction, route optimisation, fuel-consumption analytics, crew-scheduling intelligence, port-delay tracking, contract-performance monitoring, asset-utilisation dashboards, safety-incident predictionImprove utilisation, reduce downtime and protect contract performance
    Fabrication yards and workshopsEquipment-utilisation analytics, welding-productivity tracking, quality-inspection intelligence, material traceability, workforce-productivity analytics, project-progress verification, inventory optimisation, HSE-trend detectionConvert yard activity into measurable productivity and quality
    Downstream, midstream and gasDemand forecasting, inventory optimisation, trucking-and-logistics intelligence, facility reliability, gas-pipeline monitoring, customer-and-contract analytics, safety-and-compliance reporting, energy-consumption optimisationImprove supply reliability, commercial visibility and operational efficiency, increasingly central as Nigeria commercialises gas
  • Compare the list for your type with your three pillars from Section 27. Where they agree, you have a starting point. Where they disagree, one of them is wrong for your company, and you should be able to say which and why.
Where the book's list for your type and your own ranking disagree, write the disagreement down. It is usually where the plan becomes honest.
17:00 – 22:00
The leadership model for AI survival
  • Everything resolves, the book says, into a leadership problem: this industry's AI cannot be led by a pure technologist or a pure operator. Eight capabilities define the leader who can.
  • Strategic clarity: knowing where AI creates value and refusing to chase it where it does not. Operational discipline: linking every model to a real decision and action in the field. Data accountability: making data ownership non-negotiable. Governance maturity: controlling risk, cyber exposure and model trust.
  • People development: building the workforce. Commercial focus: anchoring every investment to a baseline and a business outcome, and killing what does not pay. Execution speed: moving from pilots to scale through disciplined replication. Local capability: an intelligence layer owned and operated by Nigerians, not rented.
  • THE DOCTRINE

    The decisive leader is not the most technical person in the room. It is the one who can turn technology into business performance by connecting all eight.

  • IN THE FIELD · THE WORKED CASE
    • Field. In a fictional fabrication yard, the book's priorities point to welding-productivity tracking and material traceability. The field question is whether the yard's records of welds, inspections and materials are good enough to track at all, so the first KPI it can honestly baseline may be data-quality score.
    IN THE BOARDROOM · THE PARALLEL
    • Boardroom. The same yard's board chooses a focused KPI set across the four themes, each with a baseline and an owner. Commercial focus means it agrees now what result would make it stop the work.
Score yourself on the eight before your board does.
Key Terms

MTBF and MTTR

Mean time between failures and mean time to repair, which the book tracks underneath its reliability-and-operations KPIs rather than as separate lines.

Integrative leadership

Connecting operations, data, risk, technology, finance, people and governance into one executable operating model.

Self-Check — Before You Submit
1. The managing director of a fictional marine and logistics company wants the first AI investment to be a fleet-wide digital twin. Vessel downtime is the loss that costs the company most. What do you advise?
  • A. Approve the twin, since twins suit marine operations
  • B. Start with vessel-maintenance prediction tied to utilisation and downtime, with a baseline, as the book's plan for the type directs
  • C. Start with demand forecasting
  • D. Wait until all sixteen KPIs have baselines
B. Start with vessel-maintenance prediction tied to utilisation and downtime, with a baseline, as the book's plan for the type directs — The book's marine priorities lead with vessel-maintenance prediction, and its objective is to improve utilisation and reduce downtime. Focus means starting where value is clearest. Twins do matter for marine operations, the book says, but they are not on its marine priority list, and demand forecasting is a downstream priority.
2. Which KPI belongs to the book's capability theme?
  • A. Tender win-rate improvement
  • B. Data-quality score
  • C. Equipment availability
  • D. AI adoption rate
D. AI adoption rate — The capability theme holds AI adoption rate and workforce-training completion. Data-quality score is tempting because it sounds like capability, but the book places it under compliance and data.
3. Why does the book put project controls and schedule-risk prediction among the first priorities for EPC and construction companies?
  • A. In project businesses the unforecast surprise is exactly where margin disappears
  • B. NUPRC requires them of contractors
  • C. They are the cheapest tools to buy
  • D. They replace the project manager
A. In project businesses the unforecast surprise is exactly where margin disappears — The book's EPC objective is faster delivery with stronger cost control and fewer execution surprises. It cites no regulator requirement for these tools.

Today’s Assignment

Write Section 28 of your plan: the game plan for your company's type and the KPIs your board will track.
  • Name your company type and state its objective as the book gives it. If your business spans two types, choose one and explain why, by reference to your costliest loss.
  • From the book's priorities for your type, select the two or three you will act on first, and reconcile them with your three pillars from Section 27. Where they disagree, say which you are following and why.
  • Choose a focused set of KPIs from the sixteen, across the four themes. For each, give today's baseline, or state that it is not yet known and who will establish it by day 30, with the owner by role and the source of the number.
  • Name the activity metrics your company currently reports to its board in place of outcomes.
  • Score yourself against the eight leadership capabilities and name the two weakest, with what you will do about each. If your company has no AI in use yet, the KPIs still apply: they measure the operation, not the software.
YOUR 90-DAY PLAN

Section 28 — The game plan for our company type and the KPIs we will track.

How this is marked — the rubric
Company type and the book's objective stated, with a reasoned choice where types overlap15
Two or three priorities chosen and reconciled with the Section 27 pillars25
A focused KPI set across all four themes, each with baseline or honest gap, owner and source35
Activity metrics named honestly and the two weakest leadership capabilities addressed25
Total · pass mark 70100
Submitting session 28
Write your answer in Word or Google Docs. The first line must read Session: 28, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Pop Quiz 6 — The Game Plan opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

5 questions · 10 minutes · covers Sessions 26–28 · pass mark 70
Sit Pop Quiz 6 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Segment-specific sequencingKPI selectionBaseline disciplineLeadership self-assessmentOutcome over activity
Tick it once you have submitted.Next: Session 29 →
Part Six · The Leadership MandateSESSION 29
The 90-Day AI Survival Roadmap
Session 29 of 30 · 25-Minute Module

Why This Matters

Twenty-eight sections describe what your company should do. This one says when, and who. Chapter 17 compresses the start into a 90-day readiness sprint: thirty days to diagnose the company honestly, thirty to design the AI operating model, thirty to launch three to five pilots that each carry a measured business outcome. It is not the full transformation. It is the starting discipline that proves your company can convert intelligence into action, and it earns the mandate for everything after. Appendix A gives you the blueprint each pilot follows; Appendix B gives you the board metrics that judge the whole effort. Practice Exam 6 opens at the end.

25-Minute Module
5:00 – 11:00
Days 1–30: diagnose the company, honestly
  • Read the current state without flattering anyone: data sources and quality gaps, existing systems, field-reporting, maintenance and production processes, tendering and compliance workflows, cybersecurity maturity, workforce AI literacy, leadership readiness, and the real bottlenecks where value is leaking.
  • The AI Readiness Diagnostic answers five questions: where is value being lost; what data exists today; what data cannot be trusted; which use cases create the fastest value; and what must be fixed before scaling.
  • THE DOCTRINE

    A diagnostic that protects egos is worthless. The one that names the real gaps is what makes the next sixty days productive.

  • For the first pilot, Appendix A's opening month does the same work at small scale: select one high-value, bounded problem the organisation already complains about; map how the work actually flows today; quantify the cost of its friction; name the owners; and define the single decision the pilot will improve. Output: a written charter with scope, baseline, data required and an accountability map.
Ask someone who does not report to you to read the diagnostic before you sign it.
17:00 – 22:00
Days 61–90: launch pilots that matter
  • Restraint is the discipline. Do not start with twenty; start with three to five, chosen for clear value and adequate data. The book's candidates include predictive maintenance on critical equipment, AI-assisted tender compliance and bid readiness, field-reporting automation, production-deferment analysis, compliance-document tracking, procurement-delay risk alerting, pipeline-surveillance risk mapping and an executive operations dashboard.
  • Each pilot needs nine things: a business owner, a data owner, a success metric, a timeline, a budget, a risk review, a governance control, an executive sponsor and a measured outcome. Appendix A's final month runs the workflow live, tracks decisions to outcomes, measures against the baseline and ends in a decision: continue, expand, adjust or stop.
  • THE DOCTRINE

    A pilot without a measured business outcome is not a pilot. It is a demonstration, and demonstrations do not compound into a company.

  • Appendix B board metricWhat it shows
    Decision cycle timeThe master metric: signal to decision to action
    Production reliabilityHow dependably planned production is delivered
    Operating-margin improvementImprovement attributable to the intelligent operating model
    Workflow automation rateRoutine work executed through governed, automated workflows
    Reporting accuracyThe ability to produce, trust and defend operational, financial and regulatory numbers
    AI adoption qualityWhether AI is used well, in real decisions, and trusted by its users
    Cross-functional accountabilityWhether ownership of outcomes that span silos is clear and honoured
    Strategy execution velocityThe rate at which intention becomes accomplished change
  • Each metric must be tied to a baseline. A transformation that cannot state today's decision cycle time cannot credibly claim to have improved it.
Think of decision cycle time as your Operating-Intelligence Loop with a clock on it. Know yours before day 1.
Key Terms

AI Program Office

A small, empowered unit connecting IT, operations, finance, commercial, HSE, compliance, HR and procurement under executive sponsorship, owned by the business rather than IT.

Demonstration

In the book's sense, a pilot without a measured business outcome. It may impress, but it does not compound.

Self-Check — Before You Submit
1. On day 65 at a fictional EPC company, the programme manager proposes launching eleven pilots to show momentum. Several have no baseline or business owner. What do you decide?
  • A. Launch all eleven; momentum matters most
  • B. Launch now and add baselines later
  • C. Cut to three to five with clear value and adequate data, each with all nine elements
  • D. Postpone every pilot to next year
C. Cut to three to five with clear value and adequate data, each with all nine elements — The book says start with three to five, not twenty, each with a business owner and a measured outcome. Each pilot also needs a data owner and a success metric; launched without baselines or owners, pilots are demonstrations, and demonstrations do not compound.
2. Why does the book insist the AI programme is owned by the business rather than IT alone?
  • A. IT lacks the budget
  • B. Only the business can decide what is worth doing and be held accountable for the outcome
  • C. The regulator requires it
  • D. IT cannot run pilots
B. Only the business can decide what is worth doing and be held accountable for the outcome — The book calls ownership the single most important design decision: IT-owned programmes produce tools, business-owned ones produce performance. It gives no budget or regulatory reason.
3. Which board metric does Appendix B call the master metric?
  • A. AI adoption quality
  • B. Workflow automation rate
  • C. Operating-margin improvement
  • D. Decision cycle time: signal to decision to action
D. Decision cycle time: signal to decision to action — Appendix B names decision cycle time. Operating-margin improvement is one of its other seven core indicators, not the master metric.

Today’s Assignment

Write Section 29 of your plan: your company's ninety days, diagnose, design and launch, with owners, baselines and the stop-or-scale decision.
  • Days 1–30: who leads the AI Readiness Diagnostic, what it examines, and your honest draft answers today to its five questions. Name what in your company is most likely to make it flatter than the truth.
  • Days 31–60: your governance committee and Program Office by role, the executive sponsor, the data-ownership model and the business function that owns the programme.
  • Days 61–90: three to five pilots drawn from Sections 26 to 28, each with the nine elements.
  • A charter for the first pilot in Appendix A form: scope, baseline, data required, accountability map and the single decision it improves, with today's decision cycle time for that decision or how you will measure it.
  • The continue, expand, adjust or stop decision: its date, who makes it and what result triggers each outcome. If your company has no AI in use yet, the ninety days still start with the diagnostic.
YOUR 90-DAY PLAN

Section 29 — Our ninety days: diagnose, design, launch, with owners and the stop-or-scale decision.

How this is marked — the rubric
An honest diagnostic plan with draft answers to all five questions20
An operating model owned by the business, with committee, Program Office and sponsor by role20
Three to five pilots, each with all nine elements25
A first-pilot charter in Appendix A form, with baseline and decision cycle time20
A dated stop-or-scale decision with criteria for each outcome15
Total · pass mark 70100
Submitting session 29
Write your answer in Word or Google Docs. The first line must read Session: 29, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Practice Exam 6 — Full Syllabus opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

15 questions · 25 minutes · covers Sessions 1–29 · pass mark 70
Sit Practice Exam 6 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Readiness diagnosisAI operating model designPilot portfolio disciplineBoard-level metricsStop-or-scale decisions
Tick it once you have submitted.Next: Session 30 →
CapstoneSESSION 30
Move Now: The Signed 90-Day AI Survival Game Plan
Session 30 of 30 · 25-Minute Module

Why This Matters

Twenty-nine sessions ago you named your company, its type and the one loss that costs it most. Every section since has been written around that loss. Today you assemble them into one document, sign it and put it before your executive committee: your 90-Day AI Survival Game Plan. The book ends on two instructions, and this session carries both: Chapter 17's final message, move now, and the conclusion's charge, which belongs to you rather than to a vendor or a digital team. After you submit the plan, you sit the Final Exam.

25-Minute Module
5:00 – 10:00
Leadership using AI
  • The argument of the book is one sentence: artificial intelligence will not save Nigerian oil and gas; leadership using artificial intelligence will.
  • THE DOCTRINE

    Every ingredient is present except the one that cannot be bought: the executive discipline to sequence it. Data first, bounded pilots, human judgement in the loop where the stakes are high, scale what pays.

  • That discipline cannot be delegated to a vendor or to a chief digital officer without executive air cover. It belongs to leaders willing to be held to the number.
  • I began the book with a moment of complacency: an offer to speak on AI at one of the industry's flagship gatherings, answered politely with the verdict that a session on AI was not needed. My answer is direct. It is needed, and urgently, because the window in which AI is a differentiator rather than table stakes is open now and closing.
  • IN THE FIELD · THE WORKED CASE
    • Field. At the asset, moving now means the one loss you named in Session 1 has an owner, a baseline and a start date.
    IN THE BOARDROOM · THE PARALLEL
    • Boardroom. At the table, it means a signed plan, agreed decision dates and a signatory held to the number. The same loop, seen from both ends.
Knowing is not the same as leading. The signature is where one becomes the other.
17:00 – 22:00
The executive summary and the signature
  • On top goes a one-page executive summary: the company and its type; the one loss and its baseline; the three pillars that come first; the pilots, each with a business owner and measured outcome; KPIs and board metrics with baselines; the capability pilot; and the dates of the day-30, day-60 and day-90 deliverables and the stop-or-scale decision.
  • Test the plan against the six frameworks. Does it close your loop where it breaks? Is the data foundation built for the first decision? Is every use placed on the Autonomy Ladder and the Value-versus-Risk Map? Is the order sequenced? Does every pilot connect the capability to the barrel?
  • THE DOCTRINE

    Pick the one loss that costs you most, name the owner, set the baseline, and start the ninety days on Monday. Not a committee. Not a strategy offsite. A start.

  • Sign and date it. A signature on this plan means the people who read it may hold you to its numbers.
Sign only what you would defend to your own board on day 90.
Key Terms

Readiness sprint

The book's first ninety days: not the full transformation, but the discipline that proves the company can turn intelligence into action.

Differentiator versus table stakes

AI that sets a company apart versus AI that is merely the price of competing. The book says the window in which AI is a differentiator is open now and closing.

Self-Check — Before You Submit
1. The CEO of a fictional marginal field operator reads the signed plan and proposes a strategy offsite next quarter before anything starts. What does the book's charge direct?
  • A. Hold the offsite; alignment comes first
  • B. Form a committee to review the plan
  • C. Wait for the next budget cycle
  • D. Name the loss owner, set the baseline and start the ninety days on Monday
D. Name the loss owner, set the baseline and start the ninety days on Monday — Chapter 17's charge is explicit: not a committee, not a strategy offsite, a start. The offsite feels responsible, but it is exactly the delay the book warns against.
2. What does the conclusion name as the one ingredient that cannot be bought?
  • A. The executive discipline to sequence it
  • B. Frontier AI models
  • C. Cloud computing capacity
  • D. Data scientists
A. The executive discipline to sequence it — The book says the technology is ready, the data gettable and the talent reachable. What is missing is the discipline to sequence it, which is why it is a leadership deliverable, not a purchase.
3. According to the book's final message, what happens to companies that wait?
  • A. They avoid early mistakes
  • B. They gain from cheaper technology later
  • C. They are forced to react on someone else's timetable
  • D. They are protected by the regulator
C. They are forced to react on someone else's timetable — The book says waiting companies will react on someone else's timetable while movers set the standard. Cheaper tools later is tempting, but the advantage compounds in decision quality, not tool prices.

Today’s Assignment

Assemble Sections 1 to 29 into one signed 90-Day AI Survival Game Plan for your company, with a one-page executive summary for your executive committee.
  • Assemble all twenty-nine sections in the order listed in this session and edit for consistency, noting in one line wherever a later session changed an earlier section.
  • Write the one-page executive summary with every element listed in this session.
  • Test the plan against the six frameworks and record, in a short paragraph, where it is weakest.
  • Name the executive sponsor and the owner of the one loss by role, and the Monday on which your company's ninety days begin.
  • Sign and date the plan, and name the commitment you are least confident your company will keep, and why. The plan will run beyond 900 words; the summary may not. If your company has no AI in use yet, the plan still stands: it starts from the loss, not the software.
YOUR 90-DAY PLAN

The assembled, signed 90-Day AI Survival Game Plan.

How this is marked — the rubric
All twenty-nine sections present, in order and consistent, with corrections noted25
A one-page executive summary covering every required element25
An honest framework test naming the weakest point15
Sponsor and loss owner by role, a start date and dated 30, 60 and 90-day deliverables20
Signed, with the least-certain commitment named and explained15
Total · pass mark 70100
Submitting session 30
Write your answer in Word or Google Docs. The first line must read Session: 30, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
FINAL EXAM

Your Final Exam is sat in this session. 15 questions, of which 3 are rebuilt from questions you got wrong on the practice papers. Sit it once your capstone is submitted.

15 questions · 30 minutes · covers Sessions 1–30 · pass mark 70
Sit the Final Exam →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Plan assemblyExecutive summary writingFramework self-testAccountable sponsorshipMoving now
Tick it once you have submitted.Sit the Final Exam →
← Back to programme home