ERW CommandTerminal

THE INTELLIGENT TERMINAL LEADERSHIP PROGRAMME

From released product to collected value.

← Programme home
10-Session Programme · 25 Minutes Per Day · Free · For leaders of Nigerian terminals, depots and distribution
WEEK 2 OF 2 · APPLICATIONS, TRUST, CAPITAL AND THE LEADERSHIP MANDATE · SESSIONS 6–10 · WORK AT YOUR OWN PACE
This week’s assessments: Pop Quiz 2 — Dispatch, Distribution, Safety and Control after Session 8 · Practice Exam 2 — Full Syllabus after Session 9 · Final Exam in Session 10
By Session 10: you hold a signed Terminal Game Plan for your own company · Every assignment marked against a published rubric · Pass mark 70
Part Three · Applications That Change the OperationSESSION 6
Loading Gantries, Dispatch Performance and Equipment Integrity
Session 6 of 10 · 25-Minute Module

Why This Matters

The loading gantry is where product availability, truck readiness, customer approval, measurement and release documentation meet, and where a delay created somewhere else becomes visible. Faster loading helps only when the complete dispatch can proceed. Today you follow the dispatch journey from confirmed order to accepted delivery and work through the book's gantry arithmetic, where 100 theoretical cycles cannot produce 100 dispatches when only 75 eligible trucks are ready. Then we turn to equipment integrity, where a predictive model can direct attention but never certifies an asset, and where one commercial assumption moves an illustrative payback from 1.5 years to 15. You will leave knowing what actually constrains your movements, and who holds the integrity decision your plan must respect.

25-Minute Module
5:00 – 11:00
Priority, capacity arithmetic and what AI can do
  • Where prioritisation is disputed, establish an approved rule reflecting customer commitments, operating restrictions and commercial authority. A model must not silently give priority to the loudest message or the largest order.
  • Illustrative gantry (Chapter 9)45-minute cycle36-minute cycle
    Six bays for ten hours3,600 bay-minutes3,600 bay-minutes
    Theoretical complete bay cycles80100
    Eligible trucks actually ready7575
    Completed dispatches possibleNo more than 75No more than 75
  • These are simplified capacity calculations, not a promise of 20 additional dispatches. With only 75 eligible trucks ready, shorter cycles cannot produce 100 dispatches; the benefit may instead be shorter waiting and better service. Value the outcome that actually occurred.
  • AI can forecast arrivals and readiness by product and time window, compare sequences under approved priorities, flag orders likely to arrive with missing requirements and prepare an exception brief before the truck reaches the gate. A model that labels a truck late without showing the unresolved order condition has limited value.
  • Pilot one product or shift against a baseline that includes peak demand, equipment restriction and incomplete documentation. Measure waiting, complete cycle time, dispatches meeting commitment, rework and safety-relevant interruptions, and check whether one stage's gain created delay elsewhere.
  • THE DOCTRINE

    Do not reward speed achieved by bypassing approved controls.

Ask what the bay does in the minutes a shorter cycle frees. If the answer is wait, the constraint is elsewhere.
16:00 – 21:00
From warning to feasible action
  • Link each asset to its service, criticality, history, condition evidence, inspection findings, maintenance actions and restrictions, and keep the original maintenance description: a label such as pump failure should not erase whether a seal, motor, power supply or operating condition was involved.
  • Each warning must connect to an available maintenance action, resources and an accountable owner. A warning without a feasible response is risk information, not a realised reliability benefit; leadership funds the response, changes the plan or accepts a documented restriction within authorised limits.
  • Illustrative reliability case (Chapter 10)As assumedIf only half the downtime constrained profitable delivery
    Gross contribution protected (120 hours × 50,000 litres per hour × ₦6 per litre)₦36 million₦18 million
    Less maintenance (₦12 million) and recurring system (₦4 million) costs₦20 million net₦2 million net
    Simple payback on ₦30 million upfront1.5 years15 years
  • Illustrative, excluding tax, discounting and other cash effects. The book's lesson: the commercial constraint assumption matters more than the attractiveness of the prediction.
  • Pilot an asset class with dependable records, meaningful consequence and a practical response; evaluate false alarms, missed events, warning time and action taken, in time order and including periods with no failure. The board sees overdue integrity actions, constrained availability, recurring failures and verified benefits, not better model scores beside a growing backlog.
Before you admire a prediction, ask what the downtime would have cost if nobody had predicted it.
Key Terms

Demonstrated operating capacity

What the gantry actually achieves under real demand, readiness and restrictions, as distinct from theoretical cycles.

Economically constrained downtime

Downtime that would actually have stopped profitable delivery; only this carries the contribution a reliability case may claim.

Self-Check — Before You Submit
1. In the illustrative gantry, a 36-minute cycle gives 100 theoretical cycles against 80, but only 75 eligible trucks are ready. What should the board expect?
  • A. 20 additional dispatches
  • B. No more than 75 dispatches; any benefit may be shorter waiting and better service
  • C. 100 dispatches once dispatchers adapt
  • D. Revenue rising with the extra cycles
B. No more than 75 dispatches; any benefit may be shorter waiting and better service — Shorter cycles cannot produce 100 dispatches from 75 ready trucks. The figures are simplified capacity calculations; the tempting answers confuse theoretical with demonstrated capacity.
2. In a fictional marine terminal, a model shows a pump's readings as stable. The commercial director asks to defer its inspection to keep a line available for a cargo. What is right?
  • A. Defer it, because the model shows the pump is healthy
  • B. Defer it if the vendor confirms the model's accuracy
  • C. Refer it to the competent engineering authority within the approved integrity programme
  • D. Let another month of model scores decide
C. Refer it to the competent engineering authority within the approved integrity programme — Predictive methods do not extend an inspection interval or certify fitness for service. A vendor's accuracy claim transfers no engineering authority, and commercial pressure must not redefine approved status.
3. In the reliability case, what happens if only half the downtime would have constrained profitable delivery?
  • A. Gross ₦18 million, net ₦2 million, payback 15 years
  • B. Net halves to ₦10 million, payback 3 years
  • C. Nothing, because the prediction is equally accurate
  • D. The upfront investment falls to ₦15 million
A. Gross ₦18 million, net ₦2 million, payback 15 years — The ₦16 million of costs stays, so ₦18 million gross leaves ₦2 million net and a 15-year payback. Halving the net figure is the tempting error; costs do not halve with the benefit.

Today’s Assignment

Name the actual constraint on your decision's movement or dispatch, the stage owners, and for one asset class how a warning reaches a feasible maintenance action within your integrity authority.
  • The journey. Your decision's dispatch or movement journey in your company, with the stage timestamps you hold and those you lack, and each stage's owner by role. Name your approved prioritisation rule, or say there is none.
  • The actual constraint. Answer Chapter 9's question: another bay, better maintenance or earlier order readiness? Separate theoretical from demonstrated capacity, with evidence.
  • The integrity route. For one asset class, how a warning reaches a feasible maintenance action, who holds the engineering decision, and whether its downtime actually constrains profitable delivery.
  • The honest part. Where your company measures everything as loading time, or lets commercial pressure lean on approved status. Without a gantry, use the counterpart you depend on. No AI in use yet is normal.
  • Four hundred to nine hundred words.
YOUR 90-DAY PLAN

Section 6 — The real dispatch constraint and the integrity authority our decision must respect.

How this is marked — the rubric
Traces the journey stage by stage with timestamps held and missing and an owner by role for each25
Names the actual constraint against the book's three options, separating theoretical from demonstrated capacity with evidence30
Traces one asset class from warning to feasible action within a named engineering authority, testing the commercial constraint30
Names an honest weakness in dispatch measurement or protection of approved status15
Total · pass mark 70100
Submitting session 6
Write your answer in Word or Google Docs. The first line must read Session: 6, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
The whole dispatch journeyTheoretical versus demonstrated capacityApproved prioritisation rulesIntegrity within engineering authorityTesting the commercial constraint
Tick it once you have submitted.Next: Session 7 →
Parts Three and Four · Distribution, Quality and SafetySESSION 7
Product Distribution, Quality Release and Process Safety
Session 7 of 10 · 25-Minute Module

Why This Matters

A truck leaving your gate on time is not a delivered order, and a full tank is not necessarily saleable product. This session follows your decision past the terminal, from release to accepted delivery and the commercial record that follows, because the customer sees the final service and finance needs evidence before it can invoice. Then it turns to product quality and process safety, where the line between information that supports review and authority that permits action matters most. You will name who releases product in your business, and write down which safeguards and approvals no AI application will replace. That paragraph may be the most important one in your plan.

25-Minute Module
5:00 – 11:00
The evidence chain from order to invoice
  • Link seven records: order, customer readiness confirmation, transport assignment, terminal release, route events, delivery acknowledgement and invoice. Keep estimated and actual arrival separate, and record changes to destination, quantity and acceptance conditions with approval.
  • Use location information proportionately, with authorised access and an established purpose. It may support arrival estimation. It does not prove the quantity delivered or the quality accepted; those need custody and receiving evidence.
  • PRODUCT AND MOVEMENT · THE WORKED CASE
    • Product and movement. In a fictional distribution network, tracking shows a truck at an industrial customer's gate in the morning, but the receiving tank is unavailable until the next day. A predicted early arrival is then of little use.
    OWNERSHIP AND VALUE · THE PARALLEL
    • Ownership and value. Finance cannot invoice on the location signal; it needs the delivery acknowledgement and accepted custody evidence. Cash waits on distribution evidence, and nobody is presumed at fault because the record is incomplete.
  • AI can forecast arrival ranges, flag commitments at risk and compare allocation options alongside receiving readiness, preparing actionable exceptions: confirm the slot, revise an authorised dispatch, arrange a resource or escalate a blocked delivery.
  • Illustrative distribution case (Chapter 11)Figure
    Ten repeat trips avoided at ₦150,000 each₦1.5 million gross avoided transport cost
    Still to deduct and verifyCoordination cost; that the trips would otherwise have occurred; which party receives it under the contract
  • Additional sales need evidence of additional demand served. Quicker delivery of the same sale is not new revenue.
Before anyone counts the ₦1.5 million, ask whose contract it lands in.
15:00 – 21:00
Quality release and process safety
  • An available quantity is not necessarily saleable or releasable. Connect product identity, sampling, laboratory results, specification, hold status and release decision. A certificate attached to the wrong batch can be more misleading than a visibly missing one.
  • THE DOCTRINE

    Distinguish information that supports review from authority that permits action. A model may summarise a certificate. It does not become the person authorised to release the batch.

  • Where aviation fuel is in scope, use the applicable controlled quality-assurance standards; the Joint Inspection Group publishes standards and guidance for aviation fuel operations [5]. AI should flag ambiguity, not invent a specification or acceptance limit.
  • API Standard 2350 addresses overfill prevention in petroleum storage tanks, and an AI inventory forecast is not an independent overfill safeguard [6]. The HSE safety bulletin on high-level switches following Buncefield illustrates why the reliability and correct use of specific protective equipment require attention; keep that assurance separate from any analytical application [7].
  • A missing signal should produce an explicit degraded-information state, not a smooth forecast, and the response follows the approved facility process. Start with a read-only quality-document review testing wrong-batch certificates, missing results, superseded documents and product on hold.
  • THE DOCTRINE

    Do not average unacceptable control failures into an overall accuracy score. A model useful for routine document review may still be unsuitable for a release-related decision.

If a forecast could ever be mistaken for a safeguard, write down in plain words that it is not one.
Key Terms

Batch identity

The controlled link between a batch, its samples, results, specification, hold status and release decision.

Degraded-information state

An explicit status when a signal is missing, so the approved process governs the response rather than a smooth forecast.

Self-Check — Before You Submit
1. A fictional depot's tracking data shows a truck stopped at the customer's site for two hours. What does that establish?
  • A. The quantity delivered
  • B. That the customer accepted the product
  • C. Grounds to raise the invoice
  • D. It may support arrival estimation; acceptance needs custody and receiving evidence
D. It may support arrival estimation; acceptance needs custody and receiving evidence — A location signal does not prove the quantity delivered or the quality accepted. Invoicing on it is the tempting shortcut; the invoice needs acknowledgement and accepted custody evidence.
2. How should a board treat the illustrative ₦1.5 million from ten avoided repeat trips at ₦150,000 each?
  • A. As gross avoided cost, before coordination cost, verified and subject to contract terms
  • B. As new revenue for the terminal
  • C. As net profit to the terminal
  • D. As a sector benchmark for distribution savings
A. As gross avoided cost, before coordination cost, verified and subject to contract terms — The book calls it gross avoided transport cost, before coordination cost, with the trips verified and the contract deciding who benefits. Net profit to the terminal ignores both the costs and the contract.
3. A fictional terminal's quality-document assistant scores highly overall but missed two wrong-batch certificates in testing. The sponsor wants it to approve release decisions. What should happen?
  • A. Approve it, because the overall score is high
  • B. Keep it for evaluated routine review, assess the missed critical defects separately, and keep release with authorised quality personnel
  • C. Withdraw all AI from quality permanently
  • D. Allow release approvals automatically once the score improves
B. Keep it for evaluated routine review, assess the missed critical defects separately, and keep release with authorised quality personnel — Unacceptable control failures are never averaged into an overall score, and authority stays bounded by the evaluated use. Withdrawing everything overreacts: the model may still suit routine review.

Today’s Assignment

Trace your decision from terminal release to accepted delivery and the evidence invoicing needs, name the quality and release authority that bounds it, and state which safeguards and approvals no AI application in your business will replace.
  • The chain. Your decision in your company through the seven links from order to invoice: who records each and where responsibility changes hands, and what finance needs before it can invoice.
  • Quality authority. By role, who holds batch release and quality holds for your product, and how certificates stay attached to the right batch. If aviation fuel is in scope, how the applicable standards are identified.
  • The safeguards paragraph. Which safeguards and approvals no AI application will replace, including overfill prevention, and what your systems show when a signal is missing.
  • The honest part. Where your company treats dispatch as delivery, or a certificate could attach to the wrong batch. No AI in use yet is normal.
  • Four hundred to nine hundred words.
YOUR 90-DAY PLAN

Section 7 — From release to accepted delivery: our quality authority and the safeguards AI will not replace.

How this is marked — the rubric
Traces release to accepted delivery with each handover and the evidence invoicing needs30
Names the quality and release authority by role and how batch identity is preserved25
States which safeguards and approvals AI will not replace, including overfill prevention and a degraded-information state30
Names an honest weakness in delivery evidence or batch identity15
Total · pass mark 70100
Submitting session 7
Write your answer in Word or Google Docs. The first line must read Session: 7, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Dispatch is not deliveryThe order-to-invoice evidence chainProportionate use of location dataInformation versus release authoritySafeguards AI does not replace
Tick it once you have submitted.Next: Session 8 →
Part Four · Trust, Control and AuthoritySESSION 8
AI Governance, Cybersecurity and Controlled Autonomy
Session 8 of 10 · 25-Minute Module

Why This Matters

Every application you approve brings new dependencies: data access, model behaviour, suppliers, interfaces and the people who review its outputs. A policy file does not govern any of them. This session gives you the governance record, field by field, and the discipline of keeping analysis access apart from operational control. Then it takes on the harder question an agent raises: not whether its answer is good, but what it is authorised to do, with which evidence and under whose accountability. You will set permissions action by action and decide what happens when a task stops halfway. Pop Quiz 2 opens at the end.

25-Minute Module
4:00 – 10:00
The governance record, field by field
  • Write one record for each application. In plain language, its fields ask:
  • FieldWhat it must state
    PurposeThe business decision the application supports
    UsersWho receives the output and acts on it
    Evidence sourcesThe authorised records it may read
    Permitted outputsA summary, a recommendation or a draft
    Prohibited actionsWhat it must never do, such as release product or amend stock
    Consequence of errorWhat happens if it is wrong, late, absent or treated as authoritative
    FallbackThe operating route when it is unavailable or wrong
    OwnersSponsor, operating owner, technical owner and the independent reviewers the actual risk needs
  • Retain test cases from the real operation: missing information, unusual products, incorrect documents and attempted misuse. A technically accurate recommendation can still be unsafe if its recipient mistakes it for an approved instruction.
  • Changes to models, prompts, retrieval sources or interfaces can change behaviour. Record the change, reviewer and retesting, and do not treat an update as routine because the supplier releases it automatically.
Write the prohibited actions first. They are easier to agree and harder to forget.
15:00 – 21:00
A bounded agent and permission by action
  • An agent prepares or executes a sequence of digital tasks, so you govern the sequence, not merely one answer. Describing a system as autonomous answers none of the real questions.
  • ActionThe book's dispatch-brief agent, initially
    ReadAuthorised order, stock-status and transport records
    PrepareAssembles tomorrow's dispatch brief and lists unresolved conditions
    ProposeDrafts requests for review
    ApproveNot the agent; approval and execution may sit with different people or systems
    ExecuteCannot release product, amend stock, change customer credit or issue a movement instruction
  • Any wider permission needs separate evaluation and approval, explicit limits on record types, transaction scope and destinations, and a controlled preview of consequential changes.
  • PRODUCT AND MOVEMENT · THE WORKED CASE
    • Product and movement. In a fictional inland depot, an order changes mid-preparation and a stock-status record proves stale. If a request was interrupted, establish whether the action occurred before retrying, or duplicate reservations and tickets can follow.
    OWNERSHIP AND VALUE · THE PARALLEL
    • Ownership and value. The brief lists a customer with an unresolved credit condition; finance decides. Time saved counts only when work is actually removed, and reporting time saved is not dispatch reliability gained.
  • THE DOCTRINE

    The system should stop when required evidence or authority is missing and hand the decision to its owner. A confident narrative is not a recovery mechanism.

  • Begin with preparation and human review, and prove recovery after interruption before any automatic administrative execution. The board sees approved actions, attempts outside permission, duplicate or partial executions and verified net time saved.
The autonomy ladder moves only as the evidence supports it, and leadership keeps accountability for every permission decision.
Key Terms

Operational technology (OT)

Systems that monitor and control physical equipment, with distinctive performance, reliability and safety needs [8].

Controlled preview

A consequential change shown to an authorised person before it takes effect, so it can be inspected and stopped.

Self-Check — Before You Submit
1. A supplier seeks wider authority for its application because the new version is its most advanced. What should the approval record show?
  • A. Why AI beats a simpler rule, repaired instrument or improved workflow, with the new authority separately evaluated
  • B. The supplier's description of the new version
  • C. That adopting the NIST AI RMF establishes adequacy
  • D. How many users prefer the new version
A. Why AI beats a simpler rule, repaired instrument or improved workflow, with the new authority separately evaluated — No system gains authority because its supplier labels it advanced, and new authority needs separate evaluation. Citing the NIST AI RMF is tempting, but the book says adoption does not establish adequacy.
2. A fictional terminal's scheduling agent, approved to submit loading-slot reservations, times out while sending one. The user asks it to try again. What comes first?
  • A. Resend, since each step appeared valid
  • B. Establish whether the reservation was made before attempting it again
  • C. Give the agent execute permission to confirm the slot
  • D. Accept the agent's narrative of what happened
B. Establish whether the reservation was made before attempting it again — After an interruption, establish whether the action occurred before retrying, or duplicates follow. A confident narrative is not a recovery mechanism, and widening permission rewards the failure.
3. After evaluation, a fictional depot restricts one AI application to read-only and stops another. How should the board report treat them?
  • A. Omit them to avoid embarrassment
  • B. Report only applications still running
  • C. Report them only as write-offs
  • D. Include them as evidence of governance working
D. Include them as evidence of governance working — Chapter 13 asks the board to see applications stopped or restricted after evaluation. Treating them only as failures discourages the honest evaluation the board needs.

Today’s Assignment

Write the governance record for the application your decision might use, set its permission for each action, and name its read-only first pilot and the recovery rule for an interrupted task.
  • The governance record. All eight fields for the application in your company, with owners by role.
  • The comparison. Why AI rather than a simpler rule, repaired instrument or improved workflow. If the simpler route wins, say so.
  • Permission by action. Read, prepare, propose, approve and execute, each permitted, approval-dependent or prohibited, with the approver.
  • Access and recovery. How analysis access stays apart from operational control, the read-only first pilot, and how an interrupted task is recovered without repeating an action.
  • The honest part. Where your business runs a tool or supplier service with no owner, no change record or excess access. No AI in use yet is normal: work from the proposal in front of you.
  • Four hundred to nine hundred words.
YOUR 90-DAY PLAN

Section 8 — The governance record and permission by action for our application.

How this is marked — the rubric
Completes all eight fields with owners by role and a consequence of error covering wrong, late, absent and over-trusted output30
Justifies AI against a simpler rule, repaired instrument or improved workflow20
Sets permission for each of the five actions with an approver, keeping analysis access apart from control30
Names a read-only first pilot and a recovery rule, with an honest weakness20
Total · pass mark 70100
Submitting session 8
Write your answer in Word or Google Docs. The first line must read Session: 8, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Pop Quiz 2 — Dispatch, Distribution, Safety and Control opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

5 questions · 10 minutes · covers Sessions 6–8 · pass mark 70
Sit Pop Quiz 2 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
The governance recordAnalysis access versus controlPermission by actionFailure and recoveryHonest value of agents
Tick it once you have submitted.Next: Session 9 →
Part Five · Capital and PeopleSESSION 9
Working Capital, Terminal Economics and Local Capability
Session 9 of 10 · 25-Minute Module

Why This Matters

A profitable sale can consume more cash than the business can fund. That is the uncomfortable truth behind this session. AI proposals often blur revenue, contribution, profit, cash released and financing cost avoided, and a board that approves a blurred number cannot later tell what it bought. You will work through the book's three illustrative cash cases and read each for what it is not. Then you will price the investment completely and separate its benefits without counting anything twice. Finally, the people: a routine that depends on one analyst is not yet a capability. Practice Exam 2 opens at the end.

25-Minute Module
5:00 – 11:00
Three illustrative cash cases
  • Illustrative case (Chapter 15)ArithmeticWhat it is not
    Inventory capital2 million litres a day × (10 − 8) days = 4 million litres × ₦900 = ₦3.6 billion potential capital release₦3.6 billion of annual profit
    Financing cost₦3.6 billion × an assumed 24% for a full year = ₦864 million simplified effectCertain: it depends on borrowing terms, duration and use of the cash
    Receivables₦300 million daily invoiced sales × 5 days = ₦1.5 billion cash released (simplified steady state)Additional revenue; it needs actual collection evidence and excludes any shift in sales mix or payment terms
  • Service must stay within the approved requirement; a reduction achieved by missing deliveries is not dependable, so test delayed replenishment, higher demand and product on hold. If invoices wait for delivery acknowledgement, improve that record flow before assuming collection prediction will solve the cash problem.
  • Illustrative movement (Chapter 15)Cash flowCumulative position
    Day 0, product purchase−₦400 million−₦400 million
    Day 3, logistics−₦12 million−₦412 million (maximum funding need)
    Day 10, customer receipt+₦440 million+₦28 million (final surplus)
  • Before financing and other cash effects. A later receipt changes funding duration and potentially financing cost, not the sales value. Model doubtful collection separately, never delaying and removing the same receipt unexplained. Finance verifies signs, units and dates.
Ask to see the day your cash position is lowest. That number, not the margin, decides whether you can fund the movement.
16:00 – 21:00
A routine that survives one absence
  • Local capability means the people responsible understand the evidence, can challenge a recommendation and can sustain the routine through staff changes. Training after implementation is too late if users never shaped the workflow.
  • Skills follow responsibility: executives frame decisions and challenge economics; terminal managers connect recommendations to readiness and authority; measurement specialists examine quantity evidence; engineering evaluates asset implications; finance reconciles value and cash; digital specialists learn the operational consequence of their design choices.
  • Train on the terminal's own controlled examples: find missing evidence, an unauthorised action and a double-counted benefit. Define supplier ownership of records, configurations, documentation and support, and how the business continues if the contract ends.
  • THE DOCTRINE

    Do not make acceptance of recommendations the primary performance measure. The aim is competent challenge, not automatic compliance with the assistant.

  • Assign a deputy for each critical role, test the routine with the usual analyst absent and have another shift reproduce the result. The board sees capability by role, dependence on individuals and examples of appropriate challenge.
The leadership standard is a business that can operate, question and sustain the system it has approved.
Key Terms

Cash released

Money no longer tied up in inventory or receivables: a cash-timing effect, not annual profit or additional revenue.

Maximum funding need

The deepest cumulative cash position before the customer pays; ₦412 million in the book's illustrative timeline.

Self-Check — Before You Submit
1. A proposal says cutting owned stock from ten to eight days on 2 million litres of daily demand, at an assumed ₦900 per litre, adds ₦3.6 billion to annual profit. What is wrong?
  • A. Nothing; the arithmetic is right
  • B. The release is 2 million litres, not 4 million
  • C. ₦3.6 billion is a potential capital release; the simplified annual financing-cost effect at an assumed 24% is ₦864 million
  • D. It should be divided by ten days
C. ₦3.6 billion is a potential capital release; the simplified annual financing-cost effect at an assumed 24% is ₦864 million — The arithmetic is right, which is the trap: ₦3.6 billion is a balance-sheet and cash-timing effect, not annual profit. The ₦864 million financing-cost effect is simplified and depends on the borrowing terms, duration and use of the released cash.
2. In the illustrative timeline, the ₦440 million arrives on day 20 instead of day 10, nothing else changed. What changes?
  • A. Funding duration and potentially financing cost, not sales value
  • B. The final surplus falls to ₦14 million
  • C. Maximum funding need rises to ₦852 million
  • D. The movement becomes unprofitable
A. Funding duration and potentially financing cost, not sales value — A later receipt changes funding duration and potentially financing cost, not the sales value. Cutting the surplus confuses timing with value; doubtful collection is modelled separately.
3. A fictional depot's managing director proposes measuring staff on the share of AI recommendations they accept. What is better?
  • A. Adopt it to drive adoption
  • B. Apply it to junior staff only
  • C. Suspend the assistant until acceptance rises
  • D. Measure whether decisions use evidence and outcomes are reviewed, with a route to report errors
D. Measure whether decisions use evidence and outcomes are reviewed, with a route to report errors — Chapter 16 warns that an acceptance measure discourages appropriate challenge. The aim is competent challenge, so measure evidence-based decisions and reviewed outcomes.

Today’s Assignment

State the cash consequence of your decision, separate its benefits without double counting, list the complete cost, and name the people, deputies and supplier terms that let the routine survive without one analyst.
  • The cash consequence. A movement-level timeline with maximum funding need, or a working-capital effect, for your decision in your company, with assumed figures marked as assumed.
  • The benefits. Each placed in one of the four categories with its counterfactual, and a double-counting check against Section 6's dispatch and reliability claims.
  • The complete cost. Every cost line, the simpler alternative and a downside case.
  • The team. Skills by role, a deputy for each critical role, and supplier terms on records, configurations, documentation and support.
  • The honest part. Where your business reports cash released as profit, or depends on one person. No AI in use yet is normal.
  • Four hundred to nine hundred words.
YOUR 90-DAY PLAN

Section 9 — The economics of our decision without double counting, and the team that sustains it.

How this is marked — the rubric
States the cash consequence with correct signs and units, and says what it is not30
Separates benefits into the book's categories with a counterfactual and a double-counting check25
Lists the complete cost with a simpler alternative and a downside case20
Names roles, deputies and supplier terms that remove single-person dependence, with an honest weakness25
Total · pass mark 70100
Submitting session 9
Write your answer in Word or Google Docs. The first line must read Session: 9, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Practice Exam 2 — Full Syllabus opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

15 questions · 25 minutes · covers Sessions 1–9 · pass mark 70
Sit Practice Exam 2 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Revenue, contribution, profit and cashMovement-level cash timelinesComplete cost and benefit categoriesAvoiding double countingCapability without single-person dependence
Tick it once you have submitted.Next: Session 10 →
Capstone · The Leadership MandateSESSION 10
The Terminal Game Plan
Session 10 of 10 · 25-Minute Module

Why This Matters

Nine sessions ago you named your company, its terminal archetype and one unresolved decision. Every section since has been written around it. Today you assemble those sections into one Terminal Game Plan, lay them across Chapter 17's ninety days, complete the Appendix A pilot charter and the Appendix B scorecard and acceptance gates on evidence, and sign it for your executive committee. Chapter 17 is clear that the first 90 days are a management sequence, not a guarantee of a fully transformed terminal. The plan's job is to make the next decision inspectable. Then you sit the Final Exam, and we close where the book closes.

25-Minute Module
5:00 – 9:00
Twelve priorities and your starting point
  • Chapter 17's twelve priorities, in brief: controlled identity; reconciled stock; visible ownership and release restrictions; custody evidence closed before invoicing; loss investigated without verdicts; confirmed constraints and forecast ranges; accountable ship and shore handovers; whole-journey dispatch readiness; integrity within engineering authority; access and autonomy bounded by action; reconciled service, capital and benefits; a local team that can challenge and sustain the routine.
  • PRODUCT AND MOVEMENT · THE WORKED CASE
    • Product and movement. A marine terminal may begin with receiving and berth readiness, an inland depot with dispatch and replenishment, a refinery-connected facility with tank allocation and constrained movement.
    OWNERSHIP AND VALUE · THE PARALLEL
    • Ownership and value. A third-party storage operator may begin with entitlement and custody evidence, a distribution network with customer readiness and delivery acceptance.
  • The start follows the unresolved decision, not the appeal of a technology. Mark the priorities your plan addresses, and the one it most neglects.
If your plan does not address all twelve priorities, say which you are deliberately leaving for later.
14:00 – 20:00
Appendix B: what the board sees and decides
  • B1, the scorecard, has seven areas: inventory; custody and quality; scheduling and service; equipment; distribution; capital and cash; AI control and capability. For every red or amber issue, state the decision required, options, consequence of delay and accountable owner.
  • B2, decision rights by consequence: the sponsor approves purpose, resources and continuation; the operating owner, workflow and response; measurement, the technical basis; engineering keeps integrity authority; quality approves release; finance approves credit, valuation and posting. Digital specialists inherit no release or engineering authority. Record local stop rights too.
  • B3 acceptance gateThe question
    Input readinessAre identities, measurement bases, cut-offs and source records adequate?
    Technical performanceEvaluated on representative cases, including failures and missing evidence?
    Workflow readinessCan a responsible person act within the decision window?
    AuthorityAre permitted, approval-dependent and excluded actions explicit?
    Safety and securityHave the competent owners accepted the controls for the actual scope?
    EconomicsFull cost, counterfactual and downside, without double counting?
    CapabilityCan the terminal sustain, support and recover the routine?
  • THE DOCTRINE

    Do not average the gates so that an attractive financial return cancels an unacceptable authority or safety problem. Record each gate, reviewer and unresolved action separately.

  • B4 checks units, signs, constrained volume, who receives the benefit and a downside and delay case before the meeting. The board decision working record holds the decision requested, options, economics, consequences, conditions and resolution.
Put the open gates on the summary page, above any financial figure.
Key Terms

Stop condition

The event, agreed before the pilot starts, that stops or restricts the application, with who may suspend it.

Day-90 decision

Scale, revise, continue within a bounded scope or stop, on reconciled results and finance-approved benefits.

Self-Check — Before You Submit
1. At day 45 of a fictional depot's pilot, results disappoint. The sponsor proposes measuring a different benefit that looks better. What does Chapter 17 require?
  • A. Change it quietly; the pilot is still learning
  • B. Stop the pilot immediately
  • C. If justified, record a revised evaluation with a clear reason
  • D. Extend to day 120 under the original definition
C. If justified, record a revised evaluation with a clear reason — The benefit definition is not changed because early results disappoint; a justified change is recorded as a revised evaluation. Stopping at once is premature: day 90 decides on reconciled evidence.
2. A fictional terminal's case shows a strong return, but the authority gate is open. What should the board record?
  • A. Each gate separately with reviewer and unresolved action; the return cancels nothing
  • B. An average score that passes on economics
  • C. Approval now, closing the gate after scaling
  • D. A failed economics gate
A. Each gate separately with reviewer and unresolved action; the return cancels nothing — B3 forbids averaging so that a financial return cancels an authority problem. Approving now and fixing later is the tempting compromise, but some requirements are mandatory conditions for continuation.
3. A pilot ran well at a fictional coastal marine terminal. The group wants it at its inland depots next month. What is right?
  • A. Roll out; one approval covers the group
  • B. Roll out to the largest depot only
  • C. Abandon it, since depots differ
  • D. Specify the next scope and evidence required; one site's approval is not approval for every archetype
D. Specify the next scope and evidence required; one site's approval is not approval for every archetype — Differences in operating model and consequence can require a new review, so expansion names its scope and evidence. Abandoning it overreacts; the depots may benefit after review.

Today’s Assignment

Assemble Sections 1 to 9 into one signed Terminal Game Plan for your company's executive committee, with the A1 pilot charter, the ninety days, the B1 scorecard areas, the B3 gates, the day-90 decision rule and the board decision working record.
  • One-page summary: decision, product, facility, owner and sponsor by role, baseline, stop condition, open gates and the decision you ask for.
  • Sections 1 to 9 in order, with one-line corrections where a later session changed an earlier one.
  • The A1 pilot charter, every field completed or honestly marked missing, and the ninety days stage by stage with the evidence and decision at each review.
  • The B1 areas relevant to your decision with evidence and owner, and each B3 gate separately with reviewer and unresolved action.
  • The day-90 rule and the board decision working record: decision requested, options, consequence of delay and accountable owner.
  • Sign and date it, naming the commitment you are least confident your company will keep. With no AI in use yet, the plan still stands.
YOUR 90-DAY PLAN

The assembled, signed Terminal Game Plan.

How this is marked — the rubric
Sections 1 to 9 assembled and consistent, one-page summary, signed, least-certain commitment named20
A1 pilot charter complete, with simpler alternative, authority, stop condition and approvals20
The ninety days with evidence and decision at each review, and a day-90 rule naming the four outcomes20
Relevant B1 areas with evidence and owner; each B3 gate separate with reviewer and unresolved action25
Board decision record with decision requested, options, consequence of delay and accountable owner15
Total · pass mark 70100
Submitting session 10
Write your answer in Word or Google Docs. The first line must read Session: 10, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
FINAL EXAM

Your Final Exam is sat in this session. 15 questions, of which 3 are rebuilt from questions you got wrong on the practice papers. Sit it once your capstone is submitted.

15 questions · 30 minutes · covers Sessions 1–10 · pass mark 70
Sit the Final Exam →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Ninety-day sequencingThe pilot charterBoard scorecard and gatesDecision rights by consequenceThe day-90 decisionClosing the loop
Tick it once you have submitted.Sit the Final Exam →
← Back to programme home