ERW CommandPetrochemical

THE INTELLIGENT PETROCHEMICAL COMPANY LEADERSHIP PROGRAMME

The decision behind the chemical.

20 Sessions · 25 Minutes Per Day · Four Weeks · Free · For leaders in Nigeria’s petrochemical and specialty chemical sector

The Doctrine Card

Everything this programme rests on, on one page, taken from the book. Print it and keep it in the folder you take to the operating review. A recommendation that remains on a screen has not closed the operating loop.

The six frameworks

FrameworkWhat it says
The Operating-Intelligence LoopSense, decide, act and learn. The company senses through readings, laboratory results, stock movements, service reports and customer feedback; decides by comparing alternatives against an objective and constraints; acts through someone with authority and resources; learns by examining the outcome against the earlier evidence and expectation.
The Data-Foundation PreconditionReliable decisions require information whose identity, meaning and quality are adequate for the consequence. A result marked 98 means little until the team knows the property, unit, test method, sample, product and specification.
The Autonomy LadderFrom information support to drafting, recommending and executing approved steps. Permission depends on the action and its consequence: drafting a supplier query does not authorise changing a formulation, releasing a lot or altering a customer treatment programme.
The Value-versus-Risk MapAssess the benefit and the consequence of error together. The same model capability can occupy different positions depending on the permission granted.
The Sequencing DisciplineA dependable data foundation, a bounded pilot, human oversight where consequences warrant it and expansion based on demonstrated value.
The Operations-Excellence LensJudge the intervention through the measures of the actual business: accepted output and material losses for a producer, first-pass conformity and rework for a formulator, order fulfilment, service effectiveness and cash collection for a supplier.

These frameworks are the author’s synthesis, not official standards.

The decision record

Six fields: decision requested, alternatives, evidence and uncertainty, accountable owner, cash and operating consequences, and next review date. Put controlled supporting records behind the page and preserve revisions when the recommendation changes.

The pilot charter and the five acceptance gates

GateWhat it confirms
1 · Input readinessIdentities, units, source quality, update timing and required fields; missing and conflicting data tested; the conditions in which the application must abstain.
2 · Technical fitnessThe capability evaluated against its intended use; a proposed physical intervention needs its separate technical evaluation and approval.
3 · Workflow readinessThe output reaches a competent person in time and a feasible response exists; workload, training and resources evaluated.
4 · Authority and protectionPermissions, approval identities, access controls, suspension and recovery verified; attempted actions outside scope tested.
5 · Economics and supportCost, cash requirement and benefit categories reconciled; support and supplier exit confirmed; finance accepts the calculation boundary.

Write the charter before developing the application and agree the acceptance criteria before examining results. Record each gate as passed, passed with specified conditions or not passed, with the approving authority and evidence.

The first ninety days

DaysStage
1 to 15Establish the decision and mandate
16 to 30Establish the data and workflow
31 to 45Build and evaluate the bounded capability
46 to 60Run in shadow mode
61 to 75Use under defined authority
76 to 90Decide the next stage

The author’s proposed leadership sequence, not a universal delivery promise. If a required gate is not met, the responsible decision is to resolve it or reduce the scope.

The 20 sessions and the plan they build

#SessionPlan section
1The Decision Behind the Chemical and the Reader's ToolkitSection 1 — Our company, its business model, the one decision we will carry and where its loop breaks.
2Leading the Intelligent Petrochemical CompanySection 2 — The operating question, its executable owner and the review that resolves it.
3Production, Formulation and Supply Business ModelsSection 3 — Our business-model record, our place in the value chain and the method that fits.
4Decisions That Connect Technical Performance to MarginSection 4 — The denominator, the alternative, the contribution bridge and the cash question.
5Feedstock Quality and ProcurementSection 5 — The material defined, lot evidence preserved and the usable date modelled.
6Production Planning and Operating ConstraintsSection 6 — The binding constraint, hard constraints versus preferences and the problem formulated.
7Yield, Formulation and Process PerformanceSection 7 — Physical accounting, the approved recipe, the whole improvement priced and what a pilot must earn.
8Laboratory Data and Product ReleaseSection 8 — Prediction kept apart from measurement, exceptions investigated and release protected.
9Technical Service and Customer ApplicationsSection 9 — The application defined, the trial agreed and the AI component judged on its own contribution.
10Chemical Treatment and Controlled RecommendationsSection 10 — The objective, units and basis, separated authority and the evidence for expansion.
11Equipment Reliability and MaintenanceSection 11 — Failure consequence, the failure label, the warning window and the response chain priced.
12Utilities, Inventory and Material AvailabilitySection 12 — Critical dependencies, physical inventory status and degraded operation planned.
13Safety, Environmental Evidence and Controlled ChangeSection 13 — Specific hazard knowledge, visible change, the obligation register and the condition of protections.
14Demand, Procurement and Working CapitalSection 14 — The cash calendar, the funding trough and the downside tests.
15Data Foundations, Traceability and CybersecuritySection 15 — Stable identities, the data contract, access kept from control and recovery tested.
16Workforce, Suppliers and Decision AuthoritySection 16 — The role, substantial review, a demonstration that can fail and review capacity before permission.
17Investment Cases, Benefit Attribution and AI GovernanceSection 17 — The credible baseline, value counted once, governance of the actual system and staged funding.
18The First Ninety Days of AI LeadershipSection 18 — The ninety days stage by stage, the gates between them and the rhythm after day 90.
19The Operating Records: Traceability, Exceptions, Trials, Cash and Model EvaluationSection 19 — The operating record that matters most for our decision, completed from real evidence.
20The Executive Review: Your Signed 90-Day AI Leadership PlanThe signed 90-Day AI Leadership Plan.

ERW CommandPetrochemical · built on The Intelligent Petrochemical Company — An Operating Doctrine for AI in Nigerian Petrochemicals and Specialty Chemicals by Ritchie Wingo. Leadership training, not investment, legal or engineering advice. Back to the programme home →