ERW CommandPetrochemical

THE INTELLIGENT PETROCHEMICAL COMPANY LEADERSHIP PROGRAMME

The decision behind the chemical.

← Programme home
20-Session Programme · 25 Minutes Per Day · Free · For leaders in Nigeria’s petrochemical and specialty chemical sector
WEEK 2 OF 4 · PRODUCTION, QUALITY AND THE CUSTOMER · SESSIONS 6–10 · WORK AT YOUR OWN PACE
This week’s assessments: Pop Quiz 2 — Planning, Yield and Release after Session 8 · Practice Exam 2 — Production, Quality and the Customer after Session 10
By Session 20: you hold a signed 90-Day AI Leadership Plan for your own company · Every assignment marked against a published rubric · Pass mark 70
Part Two · Feedstock and ProductionSESSION 6
Production Planning and Operating Constraints
Session 6 of 20 · 25-Minute Module

Why This Matters

In Week 1 you named your decision, wrote your business-model record, learned the correct denominator and defined the material before comparing offers. This week the decision meets the plant. A production plan is a set of commitments against a physical system: material, equipment, utilities, competent people, laboratory capacity and a route to customer acceptance. A spreadsheet of desired quantities is useful, but it is not yet a feasible plan. Today you find the constraint that controls your objective, separate what cannot be traded from what is merely preferred, and work through Worked Case One, in which the feed with more premium output earns less unless the hours it frees are actually used.

25-Minute Module
5:00 – 10:00
Hard constraints, preferences and time
  • A constraint can be a technical limit, a contractual commitment, a funding restriction or an operating rule. Minimising changeovers or smoothing workload are preferences. An algorithm should not trade away a hard technical constraint to improve a weighted score.
  • RuleWhere it comes from
    Plant conditionApproved engineering or operating documentation
    Delivery obligationThe contract
    Credit limitThe commercial and finance arrangement
    Uncertain delivery dateAn expectation: marked uncertain, never a guaranteed input
  • When no feasible plan exists, the system should say so and show the limiting conditions, not quietly relax a rule. Management then decides whether to change a commitment, obtain resources or approve a technically justified alternative.
  • Keep planned start, actual start, processing complete, sample received, release granted and dispatch complete as separate events, with cause codes for any changed sequence. In continuous processes the competent technical team, not the model, establishes how a sample lags the process.
A plan that never reports infeasibility is relaxing a rule somewhere you cannot see.
14:00 – 21:00
Worked Case One: feedstock choice in a constrained campaign
  • The book labels this case hypothetical: every figure is assumed, both feeds are assumed qualified for the same process, and the response estimates come from a hypothetical engineering review, not a validated AI model. The window is sixty hours. Feed F1 occupies all sixty; F2 occupies fifty-two. Each consumes 100 tonnes. Premium product sells at an assumed ₦1.10 million per tonne, the alternative grade at ₦0.60 million.
  • Main campaign (assumed)Feed F1Feed F2
    Premium / alternative / loss, tonnes90 / 7 / 394 / 4 / 2
    Revenue, ₦ million99.0 + 4.2 = 103.2103.4 + 2.4 = 105.8
    Feed + conversion + disposal, ₦ million73.0 + 12.0 + 0.3 = 85.376.0 + 12.4 + 0.2 = 88.6
    Contribution, ₦ million17.917.2
  • On the main campaign alone, F1 is better by ₦700,000 despite four fewer premium tonnes. Now assume a supplementary campaign delivers 32 accepted tonnes in the freed eight hours at ₦50,000 each, or ₦1.6 million, and the scheduling programme costs ₦400,000. F2 then gives ₦18.4 million against ₦17.9 million: an assumed ₦500,000 gain, conditional on using the time. With no supplementary order F2 gives ₦16.8 million and loses ₦1.1 million.
  • Break-even: ₦1.1 million ÷ ₦50,000 = 22 tonnes, so 32 gives ten tonnes of headroom; at 20 tonnes the decision is ₦100,000 worse than F1. In the downside case F2 yields 92 premium and six alternative tonnes: contribution ₦16.2 million, ₦17.4 million after supplement and programme cost, ₦500,000 below F1. These are sensitivities, not probabilities.
The question is never which feed is better; it is which complete plan is better, and under what conditions.
Key Terms

Constraint register

Each planning rule with its source and owner, keeping hard constraints apart from preferences and marking uncertain inputs as uncertain.

Robust plan

A plan designed to remain feasible under a stated set of variations; not proof that every disruption is covered.

Self-Check — Before You Submit
1. A fictional formulator's planning tool cannot fit all confirmed orders, so it shortens the cleaning time between two products. What should the head of operations require?
  • A. Accept the plan, because it scored highest
  • B. The tool reports infeasibility and the limiting conditions, so management can decide
  • C. More computing power
  • D. Drop two products without telling sales
B. The tool reports infeasibility and the limiting conditions, so management can decide — The system must say no feasible plan exists, not quietly relax a hard technical constraint. Accepting the higher score is the trap: a weighted score must never buy feasibility by trading away a technical limit.
2. In Worked Case One, with no supplementary order, how does F2 compare with F1 after the ₦400,000 programme cost?
  • A. F2 gains ₦500,000
  • B. F2 loses ₦700,000
  • C. F2 loses ₦1.1 million
  • D. They are equal
C. F2 loses ₦1.1 million — ₦17.2 million less ₦400,000 is ₦16.8 million against ₦17.9 million. The ₦700,000 answer forgets the programme cost; the ₦500,000 gain exists only if the freed hours are used.
3. How many supplementary tonnes at ₦50,000 each does F2 need to break even against F1?
  • A. 22 tonnes
  • B. 20 tonnes
  • C. 32 tonnes
  • D. 10 tonnes
A. 22 tonnes — The supplement must cover ₦700,000 plus ₦400,000: ₦1.1 million ÷ ₦50,000 = 22. Thirty-two is the assumed volume, ten tonnes of headroom above break-even.

Today’s Assignment

Write Section 6 of your plan: the binding constraint, hard constraints versus preferences and the problem formulated.
  • Map your company's sequence from material to accepted dispatch for your Session 1 decision and name the binding constraint. A business with no production uses import readiness, receiving, release and delivery.
  • Write a short constraint register: hard constraints with source and owner by role, preferences listed separately, and what happens today when no feasible plan exists.
  • List which time events your records keep separate and which they collapse.
  • Formulate the problem as decision variables, objective and constraints, with the credible disruptions and their cash effect, before naming software.
  • The honest part: where your company plans on nominal capacity, an average changeover or an unconfirmed input. If no AI is in use yet, that is normal; the right answer may be a simpler method. Aim for 400 to 900 words.
YOUR 90-DAY PLAN

Section 6 — The binding constraint, hard constraints versus preferences and the problem formulated.

How this is marked — the rubric
Names the binding constraint from a mapped sequence and whether it moves25
Separates hard constraints, each with source and owner by role, from preferences25
Formulates variables, objective and constraints, including cash, before software30
Gives an honest example of nominal capacity or an uncertain input treated as fact20
Total · pass mark 70100
Submitting session 6
Write your answer in Word or Google Docs. The first line must read Session: 6, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Binding-constraint diagnosisConstraint registersProblem formulationBreak-even readingConditional approval
Tick it once you have submitted.Next: Session 7 →
Part Two · Feedstock and ProductionSESSION 7
Yield, Formulation and Process Performance
Session 7 of 20 · 25-Minute Module

Why This Matters

Session 6 placed your decision inside a constrained plan. Today the question is whether a claimed improvement in yield, conformity or process performance is real. A model may find a relationship between feed properties and product quality, or between batch history and rework. That relationship is evidence for investigation; it does not establish that changing the variable will cause the outcome. You will preserve the physical accounting, keep the approved recipe visible, price the whole improvement, and read soft sensing, probability and thresholds in plain language. Worked Case Two then shows a warning model whose accuracy barely beats doing nothing and whose financial case reverses under one changed assumption.

25-Minute Module
5:00 – 10:00
Evaluate beyond the fit and price the whole improvement
  • A model predicting final quality must not use a post-release status or a later rework instruction as an input. That is target leakage: it can produce impressive evaluation and poor operating use. Time-based evaluation is often relevant; examine performance across material sources, recipe versions and conditions; a model that succeeds on familiar batches may fail on a new lot.
  • Both error directions cost something: an unnecessary warning consumes investigation and may delay a valid batch; a missed warning may let a developing issue through. The threshold depends on the decision and existing safeguards.
  • IN THE PLANT · THE WORKED CASE
    • Plant. A fictional formulator recovers a batch after investigation. The technical owner first checks which recipe version was used and whether the apparent loss was transfer residue.
    IN THE MARGIN · THE PARALLEL
    • Margin. Finance asks what the batch would have earned under the baseline. If it would have sold at a lower permitted grade, the benefit is the difference between the feasible alternatives after their costs, not the batch's full value.
  • Freed vessel time earns contribution only if it is used for feasible, profitable work. A specialist supplier uses procurement suitability and accepted application performance rather than manufacturing yield.
Unused capacity is an operating improvement, but not automatically an earnings gain.
14:00 – 21:00
Worked Case Two: early review of a quality exception
  • The book states this case is entirely hypothetical; no model was trained. It recommends earlier technical review; testing and authorised disposition are unchanged. Of 600 assumed records, 360 develop the model, 120 select the threshold and 120 stay locked; 600 is not a recommended minimum.
  • Precision asks: of the warnings raised, how many were real? Recall asks: of the real exceptions, how many were warned? In the final 120 batches, 18 later need review.
  • Assumed, same 120 batchesModelExisting rule
    Reviews recommended2730
    Exceptions warned / missed15 / 312 / 6
    Precision15 ÷ 27 ≈ 55.6%12 ÷ 30 = 40%
    Recall15 ÷ 18 ≈ 83.3%12 ÷ 18 ≈ 66.7%
    ₦10,000 per review, ₦350,000 per miss₦1.32 million₦2.4 million
  • Accuracy is (15 + 90) ÷ 120 = 87.5 percent; never warning scores 102 ÷ 120 = 85 percent while missing all 18. The ₦1.08 million difference less ₦600,000 support gives an assumed ₦480,000. At ₦100,000 per miss the costs are ₦900,000 and ₦570,000; the ₦330,000 saving loses ₦270,000 after support. Safety consequences are excluded and no test is bypassed.
  • A probability score is calibrated when, among batches given a similar score, roughly that share prove to be exceptions. The threshold is where a score becomes a warning. Guo and colleagues (On Calibration of Modern Neural Networks, 2017) showed strong classification need not mean calibrated confidence, on image and document data only. Under the simplified costs, if review reliably avoids the stated consequence, ₦10,000 ÷ ₦350,000 suggests reviewing above about 2.86 percent: an arithmetic illustration, not an approved threshold.
Eighteen assumed exceptions cannot establish coverage of every material condition. Ask for the uncertainty, not just the rate.
Key Terms

Precision and recall

Precision: the share of warnings that concerned a confirmed event. Recall: the share of confirmed events that were warned.

Target leakage

Using information unavailable at the decision time, such as a post-release status, which can inflate evaluation results.

Self-Check — Before You Submit
1. A vendor's quality-warning model scores 87.5 percent accuracy against 85 percent for never warning, and calls the gain marginal. What should the quality director ask for?
  • A. Higher aggregate accuracy
  • B. Exceptions detected, review workload and warning window, against the existing rule
  • C. Permission for the model to release batches
  • D. A larger training set first
B. Exceptions detected, review workload and warning window, against the existing rule — Never warning scores 85 percent while missing all 18 exceptions; the model catches 15. Aggregate accuracy hides that difference, and the case supplies no evidence for product release.
2. The model recommends 27 reviews, 15 of which concern a confirmed exception. What is its precision?
  • A. About 83.3 percent
  • B. 87.5 percent
  • C. 40 percent
  • D. About 55.6 percent
D. About 55.6 percent — Precision is 15 ÷ 27 ≈ 55.6 percent. The tempting 83.3 percent is recall, 15 of 18 exceptions; 87.5 percent is accuracy.
3. A recovered batch would have sold at a lower permitted grade under the baseline. The team claims its full sales value. What is the benefit?
  • A. The difference between the feasible alternatives, after costs
  • B. The full sales value
  • C. Nothing
  • D. Full value less software cost
A. The difference between the feasible alternatives, after costs — The avoided loss is the difference between feasible alternatives after their costs. Full value ignores what the baseline earned; nothing ignores a real, smaller gain.

Today’s Assignment

Write Section 7 of your plan: physical accounting, the approved recipe, the whole improvement priced and what a pilot must earn.
  • State the balance boundary for your Session 1 decision in your company and where quantities fail to reconcile.
  • Explain how your company separates authorised, made and deviated recipes, and which formulation data must stay controlled.
  • Price the whole improvement against the feasible baseline, with all costs, and say whether freed time would really be used. A specialist supplier uses suitability and accepted application performance.
  • State what a pilot must earn: both error directions, reviewer capacity and the gate to controlled review.
  • The honest part: where your company has claimed a gain without its baseline or treated a correlation as a cause. If no AI is in use yet, that is normal. Aim for 400 to 900 words.
YOUR 90-DAY PLAN

Section 7 — Physical accounting, the approved recipe, the whole improvement priced and what a pilot must earn.

How this is marked — the rubric
Defines the balance boundary and preserves unreconciled differences25
Separates authorised, made and deviated recipe identity20
Prices the improvement against the feasible baseline with all costs30
States error directions, capacity and pilot gates, with an honest example25
Total · pass mark 70100
Submitting session 7
Write your answer in Word or Google Docs. The first line must read Session: 7, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Material balance disciplineRecipe version controlWhole-improvement pricingPrecision and recallPilot gates
Tick it once you have submitted.Next: Session 8 →
Part Three · Quality and Customer ApplicationSESSION 8
Laboratory Data and Product Release
Session 8 of 20 · 25-Minute Module

Why This Matters

Release is where technical evidence becomes a commitment to a customer. A laboratory result supports a specific conclusion about a specific sample under a stated method; it carries no meaning outside that context. AI can identify trends, retrieve approved methods or assemble an exception history. It can also make weak records look coherent. Today you will identify the sample and the question, keep prediction apart from measurement, read measurement uncertainty and process capability in plain language, investigate an exception before disposition, and find where your release queue actually waits. Reduce delay without weakening release.

25-Minute Module
5:00 – 10:00
Keep prediction and measurement distinct
  • A statistical estimate is not the same event as the required laboratory determination. Any permitted use of a prediction must be explicit; its purpose may be early investigation or planning, not release.
  • ISO/IEC 17025:2017 is the international standard addressing the competence of testing and calibration laboratories. It supports the need to evaluate laboratory competence; it does not certify an AI model or show that a laboratory is accredited for every test.
  • Ask which measurement remains necessary, which uncertainty matters and who authorises disposition. Overall accuracy may look strong because most batches are comfortably within specification, so judge a model near the limit. A warning issued after the release meeting is not early warning. Never round a borderline value so that it silently changes the disposition.
Comfortable batches can flatter a model. Judge it on the ones near the limit.
16:00 – 21:00
Investigate the exception, then find where the queue waits
  • An exception triggers an investigation of sample integrity, method, equipment, material history and processing record. Disposition may be authorised release, further evaluation, approved rework, a permitted alternative grade or rejection. A customer concession is recorded with scope and authority, not as a silent change to the specification. An assistant drafts the summary; it does not select the disposition.
  • IN THE PLANT · THE WORKED CASE
    • Plant. A fictional specialty formulator breaks release time into collection, transport, receipt, analysis, investigation, review and disposition, and finds two hours lost locating a missing dossier. A retrieval assistant helps there; it does nothing for an overloaded instrument.
    IN THE MARGIN · THE PARALLEL
    • Margin. Finance asks what the saving changes. An assumed cut from 48 hours to 24 does not release a day's cash if delivery and payment schedules stay the same; with weekly acceptance it depends on crossing a dispatch cutoff.
  • THE DOCTRINE

    Begin by examining where the delay occurs. If the laboratory is waiting for a missing batch identifier, another predictive model may add little value.

  • More warnings can lengthen the laboratory queue. State the benefit in the category actually established: faster reporting can improve service without earning contribution.
Reporting every saved hour as additional production exaggerates the result.
Key Terms

Capability index

A statistical comparison of process spread and centring with specification limits under stated assumptions. Not a release authorisation.

Decision rule

The contractual and technical rule for judging a result and its uncertainty against a limit.

Self-Check — Before You Submit
1. A result of 9.8 against an upper limit of 10.0 carries expanded uncertainty of 0.4. Production wants to ship today. What should the quality director do?
  • A. Release, because 9.8 is below the limit
  • B. Reject, because the interval reaches 10.2
  • C. Apply the agreed decision rule for uncertainty, or seek competent clarification if none exists
  • D. Use a model prediction to break the tie
C. Apply the agreed decision rule for uncertainty, or seek competent clarification if none exists — The interval crossing the limit does not itself decide acceptance; the decision rule does. Releasing or rejecting on the number alone is premature, and a model estimate never substitutes for measurement.
2. In the assumed illustration Cp is 1.67 but Cpk is 1.00. What does the gap show?
  • A. The process sits nearer the upper limit
  • B. The batch must be rejected
  • C. The laboratory is unaccredited
  • D. The process is proven stable
A. The process sits nearer the upper limit — Cpk accounts for centring; with a mean of 104 in a 90 to 110 band, the upper side gives 1.00. Neither index proves stability or decides an individual batch.
3. A tool halves release time from an assumed 48 hours to 24, and finance books a day of released cash. Customers accept deliveries weekly. What is the right challenge?
  • A. Accept it
  • B. Does the reduction cross a dispatch cutoff and change delivery or payment timing
  • C. Ask the laboratory to work faster
  • D. Reject it, release cannot be accelerated
B. Does the reduction cross a dispatch cutoff and change delivery or payment timing — If delivery and payment schedules are unchanged, the reduction does not automatically release cash. Rejecting outright is also wrong: complete records, sample logistics and a dependable approval path can shorten release.

Today’s Assignment

Write Section 8 of your plan: prediction kept apart from measurement, exceptions investigated and release protected.
  • Identify the sample, property and specification revision behind your Session 1 decision in your company, and how original results are preserved.
  • State where a prediction could help, which measurement must remain, and who authorises disposition by role.
  • Describe how exceptions are investigated before disposition and how concessions are recorded.
  • Break release time into stages, name where it waits, and state what faster release would and would not change in dispatch and cash.
  • The honest part: where your company has rounded a borderline result, overwritten a first result or treated capability as release. If no AI is in use yet, that is normal. Aim for 400 to 900 words.
YOUR 90-DAY PLAN

Section 8 — Prediction kept apart from measurement, exceptions investigated and release protected.

How this is marked — the rubric
Identifies sample, property and specification revision, with original results preserved20
Keeps prediction and measurement distinct and names disposition authority by role25
Sets an investigation route before disposition, including concessions20
Locates the real release wait and its honest effect on dispatch and cash35
Total · pass mark 70100
Submitting session 8
Write your answer in Word or Google Docs. The first line must read Session: 8, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Pop Quiz 2 — Planning, Yield and Release opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

5 questions · 10 minutes · covers Sessions 6–8 · pass mark 70
Sit Pop Quiz 2 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Sample and specification identityPrediction versus measurementUncertainty and capabilityException investigationRelease queue diagnosis
Tick it once you have submitted.Next: Session 9 →
Part Three · Quality and Customer ApplicationSESSION 9
Technical Service and Customer Applications
Session 9 of 20 · 25-Minute Module

Why This Matters

A product can meet its manufacturing specification and still be unsuitable for a particular customer application. For a supplier with technical service, leadership should treat that understanding as part of the product offer. For a producer or formulator without a service team, it is the counterpart you depend on. AI may retrieve technical records, compare trial histories and identify missing questions; it cannot establish suitability from a trade name and an attractive sales description. Today you will define the application, agree the trial and baseline, protect the customer's information and measure service effectiveness. Worked Case Three shows a trial whose average looks good and whose adoption test fails, and an assistant judged on its own contribution.

25-Minute Module
5:00 – 9:00
Baseline, information and service effectiveness
  • Record existing performance and its conditions, and capture changes during the trial with timestamps rather than averaging them away. An observed outcome is not a conclusion about its cause.
  • Agree permitted data use, access, sharing and retention. A supplier should not assume customer operating information can train a service other customers can reach. A customer-facing assistant uses approved documentation, keeps the version and date behind each answer, and escalates unqualified conditions; it never offers unsupported guarantees.
  • IN THE PLANT · THE WORKED CASE
    • Plant. A fictional supplier's engineers log many visits and reports at a customer's site. The technical review asks which trials concluded and which recommendations were accepted within scope.
    IN THE MARGIN · THE PARALLEL
    • Margin. The commercial review asks which results were actually obtained and whether the customer's own maintenance explains part of them. A performance obligation must be priced with its service resources and exposure.
Count trials concluded and recommendations accepted, not visits made.
17:00 – 21:00
The customer's economics and the AI component
  • Assumed month, 5,000 m³ExistingCandidate
    Material + analysis + service₦4.0m + ₦0.1m + ₦0.1m₦3.7m + ₦0.3m + ₦0.25m
    Total₦4.2 million₦4.25 million
    Per cubic metre₦840₦850
  • Material alone shows a ₦300,000 saving; the full comparison costs ₦50,000 more, and ₦650,000 more in the first period with a ₦600,000 setup. Unestablished benefits cannot be added to rescue the case.
  • Assume report preparation falls from four staff-hours to two and checking adds half an hour: 1.5 hours saved, ₦22,500 per report at an assumed ₦15,000 per hour, ₦450,000 over twenty reports. At ₦600,000 to operate, it does not pay on preparation time, and the saving is capacity, not cash, unless spending changes.
  • THE DOCTRINE

    The chemical trial and the document assistant must not borrow each other's success. Each needs its own attribution and cost evidence.

Ask for the full included cost per cubic metre, never the material line alone.
Key Terms

Acceptance criterion

The agreed test a trial must meet for commercial adoption, separate from its technical safeguards.

Source-bounded assistance

Assistance limited to approved documents that makes missing or conflicting evidence visible.

Self-Check — Before You Submit
1. The candidate averages 19 mg/L against a criterion requiring every result at or below 20. Sales want to report a pass. What should the managing director decide?
  • A. Pass, the average is below 20
  • B. Pass for blocks A, B, D and F as the intended scope
  • C. Full-scope adoption not approved; choose investigation, a newly defined trial or closure
  • D. Extend until the average improves
C. Full-scope adoption not approved; choose investigation, a newly defined trial or closure — Results of 29 and 21 fail a rule covering all six. Re-labelling the favourable blocks as the intended scope after the fact misrepresents the trial.
2. What are the existing and candidate costs per cubic metre in the assumed month?
  • A. ₦800 and ₦740
  • B. ₦840 and ₦850
  • C. ₦840 and ₦740
  • D. ₦850 and ₦840
B. ₦840 and ₦850 — ₦4.2 million and ₦4.25 million over 5,000 m³. The ₦800 and ₦740 figures use material alone, the comparison that hides the extra analysis and service cost.
3. The assistant yields ₦450,000 of capacity value and costs ₦600,000. What follows?
  • A. It pays, because the chemistry improved
  • B. It pays, because time saved is cash
  • C. Its permission should expand
  • D. It does not pay on preparation time alone
D. It does not pay on preparation time alone — ₦450,000 is below ₦600,000, and capacity becomes cash only if spending changes. Borrowing the chemical result to justify the assistant is the trap the book names.

Today’s Assignment

Write Section 9 of your plan: the application defined, the trial agreed and the AI component judged on its own contribution.
  • Define the customer application behind your Session 1 decision in your company: objective, measure, conditions and missing information. Without a service team, use the counterpart you depend on.
  • Set out the trial: purpose, baseline, authorisations, stop conditions, acceptance criterion and who pays.
  • State how your company protects customer information and what a customer-facing assistant may use.
  • Say how service effectiveness and any AI component are judged, each on its own evidence.
  • The honest part: where your company has quoted an average or a material-only saving as proof. If no AI is in use yet, that is normal. Aim for 400 to 900 words.
YOUR 90-DAY PLAN

Section 9 — The application defined, the trial agreed and the AI component judged on its own contribution.

How this is marked — the rubric
Defines the application and its measure before naming a product25
Specifies baseline, authorisations, stop conditions and acceptance criterion30
Sets controls on customer information and assistant sources20
Judges service and AI value separately, with an honest example25
Total · pass mark 70100
Submitting session 9
Write your answer in Word or Google Docs. The first line must read Session: 9, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
Capabilities Covered
Application definitionTrial designPaired comparison readingCustomer data protectionSeparate attribution
Tick it once you have submitted.Next: Session 10 →
Part Three · Quality and Customer ApplicationSESSION 10
Chemical Treatment and Controlled Recommendations
Session 10 of 20 · 25-Minute Module

Why This Matters

Chemical treatment joins product selection, delivery equipment, operating conditions and measurement. A recommendation can affect a customer's process beyond the product itself, so management needs a defined technical service boundary and a controlled path from analysis to action. The book supplies no dosing recipe or treatment specification, and neither does this session; those belong to a qualified, application-specific programme with the relevant approvals. You will lead the path: name the objective, make units and basis explicit, separate selection, adjustment and execution, control change, evaluate outcomes with the customer and define the evidence needed before permission expands. This session closes Week 2.

25-Minute Module
5:00 – 11:00
Units, basis and the product actually delivered
  • Basis, plainly: what a number is a quantity of. Supplied formulation, active component, mass or volume must be stated, and a concentration needs its basis and denominator. A percentage by mass should not silently become one by volume.
  • An assistant can check dimensional consistency and flag gaps; it must not infer density, active fraction or compatibility from a similarly named product. In the book's illustration, litres in one report and kilograms in another make a combined trend unreliable; the first action is a data clarification, not a programme adjustment.
  • RecordDescribesDoes not establish
    Commanded pump settingIntended deliveryProduct actually delivered
    Opening + receipts − closingApparent consumption before documented transfers, returns and lossesDelivery into the process
    Accepted delivery recordDelivery as the programme defines itEffectiveness or suitability
  • Converting volume to mass needs the actual product's density on a compatible basis. There is no treatment-rate recommendation in these accounting relationships.
A calculation can be arithmetically correct and still technically inappropriate for the application.
16:00 – 20:00
Evaluate outcomes with the customer
  • When a result deteriorates, the product may be unsuitable, execution may have differed, conditions may have changed or the measurement may need investigation. Track the throughput denominator and lag: a sample can describe material that entered before the latest intervention.
  • IN THE PLANT · THE WORKED CASE
    • Plant. A fictional water-treatment supplier's model links high consumption to poor results and suggests reducing it. The intervention history shows operators raised treatment because conditions worsened; cutting it could reverse the intended response.
    IN THE MARGIN · THE PARALLEL
    • Margin. Priced per delivered product, the supplier's revenue rises with consumption; a contract priced around a verified outcome may create different incentives. Visits, analysis and equipment support are programme costs. Same loop, read from two sides.
  • AI can highlight a pattern. Require it to keep observation and explanation distinct.
Before any model reads consumption, record why each change in consumption was made.
Key Terms

Apparent consumption

Opening quantity plus receipts less closing, before documented movements. Not proof of delivery into the process.

Change record

For a programme change: reason, evaluation, approval, revised documents and follow-up evidence.

Self-Check — Before You Submit
1. A customer's operator urgently asks a supplier's assistant to raise the treatment. What may the assistant do?
  • A. Raise the dosing setting
  • B. Update the programme and tell the customer later
  • C. Draft a review request with the approved programme and current measurements for a competent person
  • D. Ignore the request
C. Draft a review request with the approved programme and current measurements for a competent person — It may retrieve, identify and draft; a competent person evaluates and the operator executes under the customer's procedure. Ignoring the request wastes the useful part of its role.
2. One report gives consumption in litres, another delivered mass in kilograms. What comes first?
  • A. A data clarification of product, density basis, temperature relevance and method
  • B. Convert with a similar product's density
  • C. Average the series
  • D. Adjust the programme
A. A data clarification of product, density basis, temperature relevance and method — A combined trend is unreliable until the basis is established. Borrowing a similar product's density is the trap: density must not be inferred from a name.
3. A reliable reporting assistant is proposed for feedback control of dosing. What is required first?
  • A. Nothing, it is validated
  • B. A satisfaction survey
  • C. More training data
  • D. Assessment of dynamics, equipment, constraints, measurement failure, cybersecurity and fallback
D. Assessment of dynamics, equipment, constraints, measurement failure, cybersecurity and fallback — Validating a reporting assistant says nothing about control functions. The approval record must show which assessment earned each permission.

Today’s Assignment

Write Section 10 of your plan: the objective, units and basis, separated authority and the evidence for expansion.
  • Name the objective behind your Session 1 decision in your company, how it is measured and whose objective it is.
  • Make units and basis explicit, and state which records show intended, withdrawn and delivered product.
  • Separate selection, adjustment and execution with owners by role, and describe change control.
  • Define the evidence an assistant needs before proposing an adjustment.
  • The honest part: where your company read volume sold as performance or let urgency bypass change control. If no AI is in use yet, that is normal. Aim for 400 to 900 words.
YOUR 90-DAY PLAN

Section 10 — The objective, units and basis, separated authority and the evidence for expansion.

How this is marked — the rubric
Names the objective and its measure, distinct from sales volume20
Makes units and basis explicit and separates delivery records25
Separates selection, adjustment and execution with owners and change control30
Defines expansion evidence, with an honest current weakness25
Total · pass mark 70100
Submitting session 10
Write your answer in Word or Google Docs. The first line must read Session: 10, or the submission is refused. Upload the Word file (.docx), or switch to the Google Doc tab and paste your document’s share link.
Marked against the rubric above and returned as a written letter, saved to your progress page. Do not submit until you have passed the self-check above.
ASSESSMENT NOW OPEN

Practice Exam 2 — Production, Quality and the Customer opens now. Sit it before you start the next session — it is how you find out whether the doctrine landed, and the practice papers may be resat as often as you like.

15 questions · 25 minutes · covers Sessions 1–10 · pass mark 70
Sit Practice Exam 2 →Closed book, no notes, and Coach Ritchie switches himself off while you sit it.
Capabilities Covered
Treatment objectivesUnits and basisSeparated authorityChange controlExpansion evidence
Tick it once you have submitted.Next: Session 11 →