Everything this programme rests on, on one page, taken from the book. Print it and keep it in the folder you take to the operating review. The customer promise remains the test. Dependable intelligence should help people keep it through safe delivery, usable supply and an economic result the company can defend.
| Framework | What it says |
|---|---|
| The Operating-Intelligence Loop | Sense, decide, act and learn. Sensing means obtaining evidence with a known identity, time and meaning; deciding, comparing feasible responses under stated constraints; acting, assigning a legitimate instruction to a person or system capable of executing it; learning, comparing the accepted result with the original expectation. Record a decision to take no action as well. |
| The Data-Foundation Precondition | The question is whether the evidence supports the intended decision. Resolve the identities, units, timing, permissions and relationships the application depends on, keep measured, calculated, estimated and manually entered values distinct, and make the decision reproducible. |
| The Autonomy Ladder | From observing and drafting to recommending, executing approved bounded tasks and managing a wider workflow under explicit controls. Define the delegated action in verbs; moving upward requires additional evidence and authority, a stop route and a practical fallback. |
| The Value-versus-Risk Map | Weigh economic opportunity against the consequence of an incorrect recommendation. Keep safety, integrity, permission and authority conditions outside the economic ranking, and assess each failure direction separately. |
| The Sequencing Discipline | Establish the decision and evidence before increasing scope: a baseline and the simplest credible alternative, historical comparison, shadow mode, the full response chain, then expansion only where evidence supports it. Gates are separate decisions, and a stopped pilot can be a useful outcome. |
| The Operations-Excellence Lens | Judge the application through accepted delivery, product quality, reliability, energy intensity, inventory integrity, controllable losses, working capital and cash conversion, on a linked scorecard of technical, workflow, operating and financial performance. |
These are author frameworks, carried forward from The Intelligent Barrel. They are not regulatory requirements or official technical standards.
Define the decision in its own setting: what must be decided, by when, under which physical and contractual constraints, who can authorise the action and what evidence would establish that the decision improved the result. Specify the decision, decision time, evidence, proposed capability, existing alternative, boundary, authority, stop condition, acceptance and value evidence. Before approving development, ask what information the model could reveal that would actually change the decision; if no feasible action follows the output, redefine the use.
| Period | Main work | What it must establish |
|---|---|---|
| Days 1 to 15 | Frame the decision: current decision and alternative, boundary, decision time, evidence, users, authority and consequence; past decisions reconstructed with the information available at the time | Whether the capability could have changed a feasible response; budget and resource dependencies agreed |
| Days 16 to 30 | Establish the baseline and tests: identities, quantities, timing and permissions reconciled; a decision-specific data contract; the existing method and a simpler credible alternative | Evaluation material and acceptance gates defined before the results are seen; retention, change control, stop authority and fallback agreed |
| Days 31 to 60 | Run shadow decisions beside the accepted procedure and test the full response chain on controlled cases | Whether the warning reaches the right person, can be checked, is funded and can be completed in time; review burden and recurring cost |
| Days 61 to 90 | Decide and establish ownership: bounded operating use where gates are accepted; a review pack with evidence, unresolved conditions, cost ledger and benefits ledger | Continue, expand, revise or stop; ownership transferred to the operating service owner |
The result may be a bounded deployment, a revised pilot or a decision to stop. It should not be measured only by workshops, demonstrations and licence activation. Report the sponsor four linked layers — technical, workflow, operating and economic performance — and avoid measures that reward silence.
| Charter field | What it records |
|---|---|
| Business decision and scope | The decision the pilot will inform and the accepted operating boundary, before dates or technology features |
| Existing alternative | The current method the proposal must beat |
| Advisory authority | What the application may do, with existing protection and release controls retained |
| Evidence and tests | Time-stamped records with accepted identities; historical replay using information available at each decision time, then shadow operation and approved supervised use if gates pass |
| Technical, workflow and economic acceptance | Event-level errors and feasible warning time; acknowledgement, review, response feasibility and overrides; incremental avoidable consequence less review, response and application cost |
| Stop conditions and fallback | What halts the pilot, and the existing approved process with an assigned recovery owner |
| Final decision | Expand, restrict, redesign or stop, based on the agreed evidence |
Set numerical thresholds with the accountable owners: the book supplies no universal minimum accuracy, recall, warning time or return thresholds. Report the number of independent relevant events — ten favourable examples are not ten independent demonstrations if they arise from one equipment episode.
| # | Session | Plan section |
|---|---|---|
| 1 | The Promise at the Delivery Point and the Reader's Toolkit | Section 1 — Our company, the one decision we will carry, its decision specification and where its loop breaks. |
| 2 | Leading a Gas Business with Operating Evidence | Section 2 — The promise defined backwards, its assumptions owned and the review that follows execution. |
| 3 | The Gas Value Chains and Their Different Constraints | Section 3 — The binding constraint, the revenue chain's accepted events and the use-case screen. |
| 4 | Feed Gas Quality and Processing | Section 4 — The acceptance condition, the product record and technical accuracy separated from decision value. |
| 5 | Compression and Equipment Reliability | Section 5 — The warning, its episodes and horizon, and the response it must precede. |
| 6 | Pipeline Nominations and Delivery | Section 6 — Request, feasibility and allocation separated, the objective explicit and the balance boundary defined. |
| 7 | LNG Operating Decisions and Interfaces | Section 7 — The interfaces, the usable service defined jointly and whose value is being protected. |
| 8 | Utilities, Energy Use and Operating Losses | Section 8 — A comparable operating result, a baseline that explains the difference and one claim reconstructed. |
| 9 | CNG Compression and Distribution | Section 9 — The complete cycle, capacity counted once, uncertainty separated from eligibility and the release authority. |
| 10 | LPG Storage, Filling and Distribution | Section 10 — The three ledgers kept distinct, an adjustment treated as a decision and margin separated from funding. |
| 11 | Measurement and Custody Transfer | Section 11 — The quantity defined, its measurement chain followed and one accepted quantity reconstructed. |
| 12 | Asset Integrity, Maintenance and Spares | Section 12 — Consequence and available response, the response chain closed and controlled change for the application. |
| 13 | Data Foundations and Cybersecurity | Section 13 — The data contract, the three boundaries, the acceptance terms and the decision rights. |
| 14 | Investment Cases and Verified Benefits | Section 14 — The counterfactual, the incremental case, the benefit ledger and a falsifiable evaluation. |
| 15 | The 90-Day Review: Your Signed 90-Day AI Leadership Plan | The signed 90-Day AI Leadership Plan. |
ERW CommandGas · built on The Intelligent Gas — An Operating Doctrine for AI in Nigerian Gas and Industrial Energy by Ritchie Wingo. Leadership training, not investment, legal or engineering advice. Back to the programme home →